Skip to content
RTI

Checklist library

Construction inspection checklists you can run tomorrow

Every list below is written the way a walk actually happens: sections in build order, an item that says what you are looking for, and the number of photos that would prove it. Use them on paper, or load one into RTI and let the Photo Gate hold the submit button until the evidence exists.

9 of 101 checklists · Electrical

Electrical rough-inElectrical rough-in inspection checklistBoxes, conductors, grounding and protection before close-in.13 items21 photosElectrical Rough-in· ElectricalElectrical rough-in inspection checklistBoxes, raceways, conductors and grounding before the walls close10 items14 photosElectrical Pre-cover· ElectricalElectrical pre-cover inspection checklistThe hold-point walk before insulation and drywall bury the rough-in6 items14 photosElectrical Final· ElectricalElectrical final inspection checklistDevices, terminations, labeling and energization before turnover9 items14 photosElectrical PM· ElectricalElectrical preventive maintenance checklistRecurring walk of panels, devices and life-safety circuits in an occupied building6 items8 photosFire pump (electric or diesel) QuarterlyFire pump (electric or diesel) quarterly maintenance checklistChurn test, controller status and supervised valve checks on the fire pump7 items9 photosFire pump (electric or diesel) AnnualFire pump (electric or diesel) annual maintenance checklistFull-flow performance test against the pump curve and mechanical inspection7 items11 photosMain electrical switchgear / service section QuarterlyMain electrical switchgear / service section quarterly maintenance checklistExterior walk-down of switchgear for clearance, ventilation and heat signs6 items8 photosMain electrical switchgear / service section AnnualMain electrical switchgear / service section annual maintenance checklistDe-energized interior inspection of connections, insulation and breaker mechanisms7 items11 photos