For general contractors
Every trade held to the same standard.
You are accountable for work you did not perform, on a schedule you do not fully control. RTI gives every sub the same checklist, the same photo requirement, and the same review board, so readiness is a fact you can see instead of an answer you have to chase.



What gets in the way, and what RTI does about it
Today
Subs tell you an area is ready, you walk it, and it isn't. The walk costs you the afternoon and the trust costs you more.
With RTI
A submission cannot leave a phone until the mandatory items are answered and the required photos are attached. The database rejects anything else, so "ready" means the same thing for every trade on your job.
Today
Proof lives in five group chats, two shared drives, and someone's camera roll. When the owner asks, you go find it.
With RTI
Item photos attach to the checklist item they prove, on the tag they belong to. The closeout package is built from the approved record instead of from a week of digging.
Today
When a defect surfaces months later, nobody can say who signed what, or when they signed it.
With RTI
Every submission, decision and sign-off is written to an activity log that hashes each entry over the previous one with SHA-256. Change a record and the check fails from that entry on, and shows which one it is.
What this looks like on your job
One tag, one checklist, and the photos that have to come with it.
Tag
Level 3 East, Electrical Room
TWR-B-L3-ELEC
- Sticker location
- Door frame, Room 3E-114
- Assigned checklist
- Panelboard rough-in, GC turnover
- Panel schedule posted and legible1 photo required
- Conduit terminations sealed2 photos required
- Grounding bonded and torqued to spec2 photos required
- Room clear of debris and staged material1 photo required
Start from a checklist that already knows the walk
Real guides from the RTI library. Sections in build order, what to look for on each item, and the photos that prove it. Free to read, one click to run on a tag.
- Final inspectionFinal inspection checklist for constructionThe handover walk: systems, life safety, finishes and documentation.15 items25 photos
- Pre-pourPre-pour concrete checklistSubgrade, formwork, rebar, embeds and cover before the truck arrives.13 items23 photos
- Safety walkConstruction safety inspection checklistFall protection, access, electrical, equipment and PPE.12 items25 photos
Questions general contractors ask
3 answers
- Can every sub on my job use the same checklist standard?
- Yes. You build the checklist once and bind it to the tags you hand out. Every trade scans the same way, answers the same items, and meets the same photo requirement, so 'ready' means the same thing no matter who submitted it.
- What happens when a sub submits incomplete work?
- They can't. The Photo Gate shows on the phone and is enforced on the server: if a mandatory item is unanswered or a required photo is missing, the submit stays locked and the server refuses it. Incomplete work never reaches your review board.
- Can the owner or their rep follow along without another login to manage?
- Yes, on the Company plan. You give the client a portal login scoped to the projects you choose. They review the approved evidence and sign off from their phone, and every sign-off lands on the same tamper-evident record your team works from.