Construction inspection checklists you can run tomorrow
Every list below is written the way a walk actually happens: sections in build order, an item that says what you are looking for, and the number of photos that would prove it. Use them on paper, or load one into RTI and let the Photo Gate hold the submit button until the evidence exists.
508 of 508 checklists
Roof inspectionRoof inspection checklistDeck through edge metal, including the penetrations that leak first.11 items19 photosPunch listPunch list templateRoom-by-room closeout items with the before-and-after that closes them.15 items21 photosHVACHVAC inspection checklistEquipment set, duct, condensate, controls and startup readings.14 items24 photosFramingFraming inspection checklistPre-drywall walk: bearing, connectors, notching, blocking.13 items27 photosSite walkSite inspection checklistDaily walk: access, housekeeping, protection, environmental controls.12 items18 photosElectrical rough-inElectrical rough-in inspection checklistBoxes, conductors, grounding and protection before close-in.13 items21 photosDrywallDrywall inspection checklistPre-cover signoff, hang, rated assemblies and finish level.12 items23 photosPlumbing rough-inRough-in plumbing inspection checklistSupply, DWV, slope, supports and the pressure test that proves it.13 items24 photosPre-pourPre-pour concrete checklistSubgrade, formwork, rebar, embeds and cover before the truck arrives.13 items23 photosFinal inspectionFinal inspection checklist for constructionThe handover walk: systems, life safety, finishes and documentation.15 items25 photosQC planConstruction quality control planRoles, definable features of work, three-phase control, nonconformance.12 items15 photosITPInspection and test plan (ITP)Activities, acceptance criteria, hold points and the record per row.11 items8 photos
Run these lists with the Photo Gate.
Tag one area, scan it, and the submit stays locked until the photos exist.
30-day trial · No card required