Skip to content
RTI

For subcontractors

Prove the work before anyone asks you to.

Mechanical, electrical, plumbing, fire. Your crews already do the walk. RTI captures it as they go, so your submission is complete the first time and your pay application is not sitting behind a documentation request.

The RTI photo gate on a phone, on an electrical rough-in: two items passed with their photos attached, one still short a photo, and submit locked until the last photo and mandatory item are in.
The challenge

What gets in the way, and what RTI does about it

  • Today

    The GC sends work back for missing documentation, not for bad work, and you eat the trip back to site.

    With RTI

    The gate shows on the phone before the submission is sent. If a required photo is missing, the crew finds out standing in front of the work, not two days later in an email.

  • Today

    Your crews are already taking photos. They just end up in a camera roll nobody can search.

    With RTI

    Item photos are captured against the checklist item they prove and stored with the tag, the timestamp and the person who submitted them. Findable by tag, exportable, attributable.

  • Today

    When a dispute comes up over what you installed and when, you are arguing from memory.

    With RTI

    You hold your own record. Row-level security keeps your workspace separate, and in your own workspace you can export every inspection as files you keep, even if you stop paying us.

A real inspection point

What this looks like on your job

One tag, one checklist, and the photos that have to come with it.

Tag

Level 2, Corridor Rough-In

MED-B-L2-CORR

Sticker location
Stud bay at grid line C4
Assigned checklist
Above-ceiling rough-in, MEP
  • Supports and hangers to spec2 photos required
  • Piping insulated and labelled1 photo required
  • Penetrations firestopped2 photos required
  • Junction boxes accessible and labelled1 photo required

Questions subcontractors ask

3 answers

My crews already take photos, so why do they end up unusable?
Because they land in a camera roll with no address. In RTI each required photo is captured against the checklist item it proves and stored with the tag, the timestamp and the person who submitted it. Findable by tag, exportable, attributable.
What happens if the GC rejects our documentation?
Less often for missing paperwork. The gate shows on the phone before the submission is sent: if a required photo or mandatory answer is missing, the crew finds out standing in front of the work, not two days later in an email that sends someone back to site.
Do we keep our records if we stop using RTI?
Yes, when you run RTI in your own workspace. Every inspection exports as PDFs with checklists, photos, signatures and the audit trail, plus CSV data files, even if you cancel.

Put it on a real job.

Tag one area, run one walk, and see the record it leaves behind.

30-day trial · No card required