Skip to content
RTI

Quality control software

Construction quality control software with an audit trail that holds up

RTI is construction quality control software that keeps the record a QC program produces: who inspected what, with which photos, who approved it, and every decision written to a SHA-256 chained activity log. Crews submit through the Photo Gate, reviewers decide on one board, and nonconformances close only on an approved re-inspection.

  • Approval rights enforced in the database
  • Every decision chained in the activity log
  • NCRs close on an approved re-inspection
2 of 4 photos attached: the submit stays locked and says what is missing.
The challenge

Where a QC record loses its credibility

  • PDFs in a folder

    Signed inspection PDFs sit in a shared drive, with no way to tell whether one was replaced.

  • Accepted by whoever is closest

    The person who did the work can mark it accepted, so the record cannot show that anyone else looked.

  • NCRs in a spreadsheet

    The NCR log stops being updated in month two, and nobody can say which defects were closed with evidence.

With RTI

  1. Each decision sealed and chained
  2. Only reviewers change an outcome
  3. NCRs close on an approved re-inspection

The rules live in the database, not the screen: a member without approval rights cannot change an outcome, and the record names who decided and when.

How the QC record is built

Inspection, decision and correction, in one record

  1. Inspect against the checklist

    Each inspection point carries a QR tag and the checklist assigned to it. The crew’s answers and photos go through the Photo Gate, and every failed item needs a written observation before submit.

  2. Decide on the board

    Only members with approval rights can approve an inspection or send it back, and the server records who decided and when. A reviewer cannot change the crew’s answers.

  3. Seal every decision

    Each inspection’s answers, status and review decision are sealed with SHA-256, and each decision is written to the company’s activity log, linked to the entry before it.

  4. Track nonconformances

    An NCR carries a severity, an assignee, a due date and a root cause, moves through its own statuses, and can be closed only with a linked, approved re-inspection.

  5. Show it to an auditor

    Turnover packages built from Reports print the NCR register beside the approved inspections, and a manager can download the verification package for anyone to check the chain.

What it doesn’t do

  • It has no hold-point or definable-feature-of-work objects. What it enforces is the inspection: required answers and photos before submit, and a reviewer’s decision before approval.
  • It does not stop a reviewer from approving their own submission by default. Separation of duties is a workspace setting an admin turns on.
  • It does not certify the work. RTI documents the inspection and the decision; the AHJ or the licensed professional on the job accepts it.
Before you buy anything

What a defensible QC system has to answer

Ask what would detect an edit

Version history inside a database an administrator controls is not the same as a tamper-evident chain. Ask what specifically would detect an edit.

Check that each record is tied to a place

A QR tag on the inspection point ties each record to the place it describes, instead of to whatever the crew typed.

Check who can accept the work

The person doing the work should not be the person accepting it. The tool should make that separation structural, not procedural.

Ask for a sample auditor export

Ask for a sample export. If it does not include photos, timestamps, signatures and the chain state, it is a report rather than evidence.

Use cases

Three moments it answers

  • Use case 1Opt-in

    A failure, reported as found

    When a workspace lets crews submit a failed required item, the failure reaches the reviewer as found, and only the passing re-inspection can be approved.

  • Use case 2

    A disputed approval

    When a decision is questioned months later, the activity log shows who made it and when, and an edited entry would no longer match its hash.

  • Use case 3

    An NCR ready to close

    When the crew fixes a nonconformance, a manager links the approved re-inspection, and only then can the NCR be closed.

Questions about quality control software

5 answers

What should construction quality control software do?
Construction quality control software should hold the inspection record a QC program produces, keep the person doing the work apart from the person accepting it, track nonconformances to closure, and show later that nothing was changed. RTI does each with the Photo Gate, approval rights enforced in the database (plus separation of duties when the workspace turns it on), an NCR register and a SHA-256 chained activity log.
Can you prove a QC record was not altered?
Yes, in the sense that any change shows. Each inspection’s answers, status and review decision are sealed with SHA-256, and each activity entry carries the hash of the one before it, so an edited entry no longer matches and a removed one breaks the next link. Anyone handed the verification package can check the chain in their own browser.
Does RTI track nonconformances?
Yes. The NCR register is on for every workspace by default. Each NCR has a severity, an assignee, a due date and a root cause, moves through statuses from open to closed with due and past-due notices, and closes only with a linked, approved re-inspection.
Can the person who submitted an inspection approve it?
Only if they hold approval rights, which crews do not by default. A workspace can also turn on separation of duties, after which no one can approve or reject an inspection they submitted, whatever their role.
What does an auditor receive?
A turnover package of the approved inspections with their photos, signatures and record hashes, plus the NCR register when it is built from Reports, and the verification package, which anyone can check in their own browser. Compliance CSVs list each inspection with its record hash, responses, photo manifest and signatures.

Give your QC records an audit trail that holds

RTI covers the loop: checklists bound to QR-tagged inspection points, field capture through the Photo Gate, one review board for decisions, an NCR register, and a turnover package that carries the record.

30-day trial · No card required