Skip to content
RTI

For residential builders

The same walk, on every unit, without the binder.

Repetition is the whole job. One checklist per unit type, one sticker per door, and a tag list that shows which units are through rough-in and which are still open, lot by lot and phase by phase.

The RTI mobile app's home screen: start an inspection by scanning a tag, seven inspections waiting on a decision, and the week in numbers
An electrical rough-in inspection under review in the RTI mobile app: six jobsite photos of wiring, boxes and the panel, with send back and approve
The activity log in the RTI mobile app: the audit chain check passed with a verify now control, then today's submissions by person, tag and time
The challenge

What gets in the way, and what RTI does about it

  • Today

    Ninety units means ninety versions of the same walk, and the only record that they all happened the same way is your superintendent's memory.

    With RTI

    Build the checklist once and bind it to every unit tag. Each scan opens the unit's tag, one tap from the identical list with the identical photo requirement, so unit 12 and unit 88 are documented the same way.

  • Today

    Pre-drywall gets covered before somebody photographs what is behind it, and then a warranty claim arrives.

    With RTI

    The photo requirement is enforced before the item can be submitted, so the shot behind the wall gets taken while the wall is still open.

  • Today

    Buyer and lender walkthroughs turn into a scramble for paperwork that lives in four places.

    With RTI

    Export any of the unit's inspections as a branded PDF with its answers, photos, signatures and sign-offs, or its approved inspections as one package, whenever you want and with no lock-in.

A real inspection point

What this looks like on your job

One tag, one checklist, and the photos that have to come with it.

Tag

Unit 305, Kitchen Rough-In

RIV-A-F3-305

Sticker location
Inside of unit entry door
Assigned checklist
Kitchen rough-in, pre-drywall
  • Supply and waste lines pressure tested2 photos required
  • Range and dishwasher circuits pulled1 photo required
  • Blocking installed for upper cabinets2 photos required
  • No penetrations left unsealed1 photo required

Questions residential builders ask

3 answers

How does RTI handle ninety versions of the same unit walk?
You build the checklist once per unit type and bind it to every unit tag. Each scan opens the unit's tag, one tap from the identical list with the identical photo requirement, so unit 12 and unit 88 are documented the same way, and the tag list shows which units are through and which are still open.
What stops pre-drywall work getting covered without photos?
The photo gate. A submission can't leave the phone until the required photos are attached, so the shot behind the wall gets taken while the wall is still open, not chased after the drywall crew has been through.
Can I hand a buyer or lender a record for one unit?
Yes. Export any inspection as a branded PDF with its answers, photos, signatures and client sign-off, or search the unit's tag on the board and download its approved inspections as one package. There's no lock-in: exports keep working while you're subscribed and after you cancel.

Put it on a real job.

Tag one area, run one walk, and see the record it leaves behind.

30-day trial · No card required