Electrical rough-in inspection checklist
Rough-in is a photograph problem. Everything an inspector or a future electrician will ever want to see is visible for about a week, and then it's behind drywall for thirty years. Work this list before the rock truck shows up.
The checklist
Every item, and the photo evidence it needs
The photo count on each row is what RTI would require before the item can be submitted. Work the list here and watch the gate hold, or load it into RTI and let it enforce the real thing.
Boxes and mounting
Boxes set to finished wall depth and level
Correct setback for the finish material, square to the stud, secure without racking.
Box fill appropriate for conductors and devices
Count conductors, devices and clamps; oversize the box rather than force the make-up.
Boxes located per plan and coordinated with casework
Check outlets against the millwork and appliance layout before the wall closes.
Conductors and raceway
Cable supported and secured at required intervals
Staples within the required distance of each box, no over-driven staples pinching the jacket.
Conductors protected where they pass through framing
Nail plates at every bore near the face; adequate setback everywhere else.
No damaged jackets, sharp bends or overfilled raceway
Walk each home run; anything nicked gets replaced, not taped.
Circuit identification legible at each box and at the panel
Permanent marking that will still be readable at trim-out.
Grounding and bonding
Equipment grounding conductor present and made up in every box
Continuous through the box, pigtailed correctly, nothing left loose in the back.
Grounding electrode system installed and accessible
Connections visible, listed clamps, no paint or coating in the contact area.
Metallic systems bonded where required
Water piping, gas piping and structural steel bonded per the design.
Panel and service
Panel set plumb, accessible, with working clearance maintained
Clearance in front of the panel unobstructed by later work. Check the furniture plan.
Conductors dressed and terminated to torque spec
Neat make-up, correct lug sizes, torque marked where required.
Panel schedule posted and legible
Filled out at rough-in and corrected at trim, not written from memory at closeout.
What usually sends this back
The failures are almost always the evidence, not the work
- Box fill and stud protection fine at the panel, missed in the back bedroom nobody photographed.
- Grounding and bonding shot after the cover went on.
- Conductors damaged by a later trade with no post-damage record of who did it.
Common questions
6 answers
- What does this electrical rough-in checklist cover?
- 13 items across 4 sections, covering boxes and mounting, conductors and raceway, grounding and bonding, panel and service. Each item spells out what the person walking the job is actually looking for, not just a box to tick.
- Who should run this inspection?
- Electrical foreman on their own rough-in; GC verifies before requesting the inspection.
- When in the schedule should this walk happen?
- After framing and before insulation and drywall, with all other trades' rough-in complete so conflicts are visible.
- Why does every item ask for a photo?
- All 13 items call for photo evidence, 21 photos in all. A checklist answer without the photo is a claim; the photo is what makes the record worth something in a dispute and lets a reviewer approve work without re-walking the job.
- What most often fails an electrical rough-in inspection?
- Box fill and stud protection fine at the panel, missed in the back bedroom nobody photographed. Grounding and bonding shot after the cover went on. Conductors damaged by a later trade with no post-damage record of who did it.
- Can I use this checklist in RTI?
- Yes. Start a free RTI workspace, build this list as a checklist, and the Photo Gate holds the submit button until every mandatory item is answered and its photos are attached. Approved inspections roll into a branded turnover package with a tamper evident audit trail.
Related checklists
Run it with the Photo Gate
A checklist nobody can submit half-finished
Load this list into RTI, stick a QR tag on the area it covers, and the submit button stays locked until every mandatory item is answered and the 21 required photos exist. Approved walks roll into a branded turnover package with a tamper evident record behind every line.