Checklist library
Construction inspection checklists you can run tomorrow
Every list below is written the way a walk actually happens: sections in build order, an item that says what you are looking for, and the number of photos that would prove it. Use them on paper, or load one into RTI and let the Photo Gate hold the submit button until the evidence exists.
8 of 101 checklists · Fire protection
FirestoppingFirestopping inspection checklistRated assemblies, penetrations, joints and listed system compliance.13 items27 photosFire Protection Rough-in· Fire ProtectionFire Protection rough-in inspection checklistPiping, hangers and head locations verified against the reflected ceiling before rough-in sign-off7 items11 photosFire Protection Pre-cover· Fire ProtectionFire Protection pre-cover inspection checklistHydrostatic test held and head clearances verified before the ceiling closes above the system4 items8 photosFire Protection Final· Fire ProtectionFire Protection final inspection checklistHeads, escutcheons, spare stock and system interface verified before the AHJ final and turnover6 items9 photosFire Protection PM· Fire ProtectionFire Protection preventive maintenance checklistRecurring inspection round of gauges, valves and system condition in an occupied building5 items8 photosFirestopping Rough-in· FirestoppingFirestopping rough-in inspection checklistPenetrations and joints sealed to a listed system while they are still accessible7 items10 photosFirestopping Pre-cover· FirestoppingFirestopping pre-cover inspection checklistThe hold-point walk before ceilings and shaft walls hide the seals4 items9 photosFirestopping Final· FirestoppingFirestopping final inspection checklistAccessible seals re-sampled and the firestopping package assembled for turnover4 items5 photos