How to inspect a solar PV installation
A rooftop PV array crosses two trades that rarely think about each other: roofing and electrical. The failures cluster at the seams — attachments that breach the roof without proper flashing, and energized DC wiring that isn't managed safely. Live PV DC is regulated, life-safety scope: the licensed electrician makes it up and the AHJ inspects and certifies it. Your job as the GC is to verify the roof stays watertight, the array is structurally attached, and the work is safe and complete to observe and document.
For the GC's superintendent and QC manager coordinating a rooftop PV installation, alongside the licensed electrical contractor and the AHJ who certify the electrical system.
Step by step
Verify roof attachment and flashing at every penetration
Confirm each mount, stanchion, or ballast bears as the design shows and that every roof penetration is flashed and sealed into the roofing system with the manufacturer's flashing, not just sealant. On a warranted roof, verify the roofer or an approved installer made the penetrations so the warranty holds.
Confirm structural loading and racking
Verify the racking is the specified system, attached and spaced per the approved layout, and that the structural review of the added dead, live, and uplift load is complete where required. Frame this as observed against the approved design; the engineer of record governs the structural adequacy.
Check module mounting and grounding
Confirm modules are the specified product, clamped at the manufacturer's points and torque, undamaged, and bonded and grounded through the listed method. Improper clamping or a broken bond path is both a performance and a safety defect.
Verify DC wiring, conductor management, and connectors
Observe that DC wiring is supported off the roof, protected from abrasion and UV, that connectors are the matched, listed type fully seated, and that conductors aren't left to chafe on racking or membrane. Mismatched or loose DC connectors are a documented fire risk — flag them for the licensed electrician.
Confirm rapid shutdown, labeling, and disconnects
Verify the rapid-shutdown provisions, placards, disconnects, and required labeling are installed per the design and are legible and accessible. These are life-safety features for firefighters — confirm they're present and observe function; the electrician and AHJ certify the system.
Check inverters, AC tie-in, and interfaces
Confirm inverters are the specified units, mounted with the required clearances and ventilation, and that the AC tie-in, metering, and any monitoring interface are complete and coordinated. Verify the point of interconnection matches the approved plan and utility requirements.
Observe commissioning and the AHJ inspection
Confirm the licensed electrical contractor commissions the array and the AHJ and, where applicable, the utility inspect and authorize the system before it's energized to grid. Record what you observe; certification and permission to operate are the electrician's, AHJ's, and utility's call.
Document the roof and electrical work and close out
Photograph flashings and attachments before anything covers them, keep the electrical inspection and commissioning records in the file, and track roof-penetration or safety deficiencies to closure so neither the roof warranty nor the energization is held up.
What gets missed
- Roof penetrations made without proper flashing, voiding the roof warranty and setting up leaks.
- Mismatched or loose DC connectors left to chafe on racking — a documented fire risk.
- Modules clamped outside the manufacturer's points or torque, or the grounding bond path broken.
- Rapid-shutdown, placards, and disconnects missing or illegible when the AHJ inspects.
- Treating the GC walk as certification — the licensed electrician and AHJ certify and energize, not you.
Questions people ask
- Why is the roofing part of a PV inspection so important?
- Because every mount is a penetration through a roof that has to stay watertight for decades, often under warranty. If the attachments aren't flashed into the roofing system by an approved installer, you've traded a solar array for a leaking roof and a voided warranty.
- Who certifies and energizes the PV system?
- The licensed electrical contractor makes up and commissions the electrical work, the AHJ inspects and approves it, and the utility authorizes interconnection where it applies. Your role is to verify the building and roofing scope and to observe and document the electrical work — not to energize or certify it.
Standards behind it
Terms worth knowing
Checklists that make this a one-tap job
Free, field-ready checklists, each with the photo every item needs before it can be submitted.
Related guides
- How to inspect electrical rough-inWalk electrical rough-in before insulation and drywall close it in: boxes, conductors, grounding, supports and clearances, with the photo each one needs.
- How to inspect a roofWalk a roof the way it goes together — deck, dry-in, flashing, penetrations, edge metal — and catch the leaks at the details before they're covered.
- How to inspect an elevator installationInspect an elevator installation as the GC — hoistway, machine room, entrances, fire and life-safety interfaces, and readiness — while the licensed inspector and AHJ certify the equipment.
Reading the steps is one thing. Proving you walked them is the job.
RTI holds the submit button until every mandatory item is answered and the photos are attached, then chains the record so it can be proven untouched later.