Plumbing inspection checklists for the rough-in, pre-cover and final walks: 3 free lists, 24 items and 36 photo requirements, each item naming what to look for and the photo that proves it. Work is commonly verified against IPC / UPC plumbing codes; the edition in force is the AHJ's call on each project.

Where each walk sits in the schedule

Plumbing rough-in inspection checklistrough-in
After underground and in-wall drain, waste, vent and supply piping is run, before backfill or wall closure and before the pressure test is called. Run by: The plumbing foreman walking their own rough-in ahead of the pressure test and the AHJ inspection.
Plumbing pre-cover inspection checklistpre-cover
After the rough-in and pressure test pass, the day before slab pour or the day drywall is scheduled on each area. Run by: The GC's superintendent with the plumbing foreman, releasing slab and wall areas for pour or cover.
Plumbing final inspection checklistfinal
After fixtures are set and water is turned on to the building, before the AHJ final and owner turnover. Run by: The plumbing foreman at trim-out, then the GC or owner's representative at final acceptance.

What most often sends plumbing work back

  • Drain lines photographed dry with no level or slope reading to prove the fall.
  • Pressure test gauges photographed at the start of the hold, not at the end when the drop actually shows.
  • Cleanouts buried in the slab or wall with no location recorded before cover.
  • Slab areas poured over piping with only a passing test on record, no photo of the gauge at pour time.
  • Sleeve locations for future fixtures not matched against the fixture plan before the slab is closed.
  • Test plugs and caps left loose, discovered leaking after the concrete is down.
  • Fixtures caulked and photographed before the water is actually run to check for leaks under the trap.
  • Water heater relief valve and pan installed but discharge routing never traced to termination.

Verified against

Families only, never clause numbers. Adoption varies by jurisdiction; confirm the edition your authority having jurisdiction enforces before you run a walk against it.

Common questions

Which plumbing inspections do these checklists cover?
Plumbing rough-in inspection checklist (rough-in): After underground and in-wall drain, waste, vent and supply piping is run, before backfill or wall closure and before the pressure test is called. Plumbing pre-cover inspection checklist (pre-cover): After the rough-in and pressure test pass, the day before slab pour or the day drywall is scheduled on each area. Plumbing final inspection checklist (final): After fixtures are set and water is turned on to the building, before the AHJ final and owner turnover.
Who runs a plumbing inspection?
The plumbing foreman walking their own rough-in ahead of the pressure test and the AHJ inspection. The GC's superintendent with the plumbing foreman, releasing slab and wall areas for pour or cover. The plumbing foreman at trim-out, then the GC or owner's representative at final acceptance.
What most often sends plumbing work back?
Drain lines photographed dry with no level or slope reading to prove the fall. Pressure test gauges photographed at the start of the hold, not at the end when the drop actually shows. Cleanouts buried in the slab or wall with no location recorded before cover. Slab areas poured over piping with only a passing test on record, no photo of the gauge at pour time.
Which standards is plumbing work verified against?
IPC / UPC plumbing codes, published by the International Code Council / IAPMO. Adoption varies by jurisdiction. Confirm the edition your authority having jurisdiction enforces before you run a walk against it.
Can I run these checklists in RTI?
Yes. Start a free RTI workspace and load any of the 3 lists (24 items in total). The Photo Gate holds the submit button until every mandatory item is answered and its photos are attached, and approved inspections roll into a branded turnover package with a tamper-evident audit trail.