Turnover & closeout
Commissioning report
Also called: Cx report, final commissioning report
A commissioning report is the document the commissioning agent issues at the end of the commissioning process, summarizing the systems tested, the results of the pre-functional checks and functional performance tests, the issues found, and how each was corrected and retested. It is the paper trail that shows the building's systems were verified to perform, not just installed. Its required contents and format follow the commissioning plan and the owner's project requirements.
Why it matters
The report is the owner's proof that commissioning actually happened and that the systems responded the way the design intended. It also flags any issues deferred to seasonal testing or to the warranty period, so the owner knows what is still open. Without it, the owner has equipment they were told works but no record of it being tested.
What proves it
The report is built from the underlying records — completed pre-functional checklists, functional test scripts marked pass or fail, and the corrections that closed each failure. When those are captured cleanly during testing, with photos of the tested equipment, the report is a straightforward summary rather than a reconstruction, and it slots into the turnover package the owner receives.
Standards it's verified against
Checklists that put commissioning report to work
Free, field-ready checklists, each with the photo every item needs before it can be submitted.
Related terms
- Commissioning (Cx)The process of verifying that installed systems actually perform the way the design and the owner's requirements intended.
- Functional performance testA scripted test that drives a system through its operating modes to prove it responds the way the sequence of operations requires.
- Systems manualA consolidated operations reference that ties the building's systems, their sequences, and their O&M and commissioning records together.
- Turnover packageThe set of documents and records handed to the owner or operator so they can run and maintain the completed building.
- Substantial completionThe milestone where the work is usable for its intended purpose, even with minor punch items still open.
- Certificate of occupancy (CO)The document the building department issues confirming a completed building is code-compliant and legal to occupy.