Skip to content
RTI

Quality concepts

Specifications

Also called: specs, project specifications

Specifications are the written requirements for the project: what products and materials are acceptable, how they are to be installed, what standards apply and how the work will be tested and accepted. Where the drawings show size, location and geometry, the specs carry the qualitative and procedural requirements the drawings cannot. Together with the drawings they form the core of what an inspection checks against — the spec is often where the real acceptance criterion lives.

Why it matters

Most 'is this the right product?' and 'is this installed correctly?' questions are answered in the specs, not the drawings. A submittal is reviewed against the spec section; a workmanship or testing requirement usually comes straight out of it.

They also name the standard families that govern the work. When a spec section points to a code or industry standard, that is what the inspection and the acceptance criteria inherit — so reading the spec is how you learn what the work actually has to satisfy.

How it shows up on site

Checklist items and submittal reviews written to specific spec sections, with the acceptance criterion — a test, a tolerance, a finish level, an applicable standard — pulled from the specification rather than assumed.

Standards it's verified against

Knowing the term is step one. Proving it is the job.

RTI holds the submit button until every mandatory item is answered and the photos are attached, then chains the record so it can be proven untouched later.