Skip to content
RTI

Checklists by equipment

2 lists · 8 items · 12 photos

Emergency lighting and exit signs maintenance checklists

Emergency lighting and exit signs maintenance checklists for the quarterly and annual rounds: 2 free lists, 8 items and 12 photo requirements, each item naming what to look for and the photo that proves it. Work is commonly verified against NFPA 101; the edition in force is the AHJ's call on each project.

Where each walk sits in the schedule

Emergency lighting and exit signs quarterly maintenance checklistquarterly
Every quarter, walked along the actual egress route floor by floor so the coverage is checked where people would travel, not just where the fixtures are easy to reach. Run by: The building engineer walking the egress path on the quarterly round, holding the test button and recording what lights and what doesn't.
Emergency lighting and exit signs annual maintenance checklistannual
Once a year, scheduled when the extended discharge can run without leaving occupied areas in the dark, and coordinated so units are recharged and back in service before the space is used. Run by: The building engineer or the electrical service tech running the full-duration discharge, recording start, end and any early dropouts on the site record.

What most often fails on an emergency lighting and exit signs

  • Push-to-test held for a second and the head flickers on, logged as good, when a tired battery would have dropped it in under a minute of real load.
  • A lamp head knocked out of aim during other work so it now lights a wall instead of the stair or the corridor turn it was set for.
  • Exit sign lit but the face washed out or the arrow pointing the wrong way after a ceiling change, so it reads fine at a glance and misleads under smoke.
  • Discharge started but never walked at the end of the run, so a unit that quit partway through the required duration is recorded as having passed.
  • One or two heads that dropped early during the discharge noted but not tracked to a battery replacement, so the same units fail again next year.
  • Units cut short and switched back before they are fully recharged, so the next real outage finds them only partly restored.

Verified against

Families only, never clause numbers. Adoption varies by jurisdiction; confirm the edition your authority having jurisdiction enforces before you run a walk against it.

Common questions

Which emergency lighting and exit signs maintenance rounds do these checklists cover?
Emergency lighting and exit signs quarterly maintenance checklist (quarterly): Every quarter, walked along the actual egress route floor by floor so the coverage is checked where people would travel, not just where the fixtures are easy to reach. Emergency lighting and exit signs annual maintenance checklist (annual): Once a year, scheduled when the extended discharge can run without leaving occupied areas in the dark, and coordinated so units are recharged and back in service before the space is used.
Who runs the emergency lighting and exit signs maintenance round?
The building engineer walking the egress path on the quarterly round, holding the test button and recording what lights and what doesn't. The building engineer or the electrical service tech running the full-duration discharge, recording start, end and any early dropouts on the site record.
What most often fails on an emergency lighting and exit signs?
Push-to-test held for a second and the head flickers on, logged as good, when a tired battery would have dropped it in under a minute of real load. A lamp head knocked out of aim during other work so it now lights a wall instead of the stair or the corridor turn it was set for. Exit sign lit but the face washed out or the arrow pointing the wrong way after a ceiling change, so it reads fine at a glance and misleads under smoke. Discharge started but never walked at the end of the run, so a unit that quit partway through the required duration is recorded as having passed.
Which standards is emergency lighting and exit signs work verified against?
NFPA 101, published by the National Fire Protection Association. Adoption varies by jurisdiction. Confirm the edition your authority having jurisdiction enforces before you run a walk against it.
Can I run these checklists in RTI?
Yes. Start a free RTI workspace and load any of the 2 lists (8 items in total). The Photo Gate holds the submit button until every mandatory item is answered and its photos are attached, and approved inspections roll into a branded turnover package with a tamper-evident audit trail.