Checklists by equipment
2 lists · 10 items · 16 photosFire and smoke damper maintenance checklists
Fire and smoke damper maintenance checklists for the quarterly and annual rounds: 2 free lists, 10 items and 16 photo requirements, each item naming what to look for and the photo that proves it. Work is commonly verified against NFPA 80 & 105; the edition in force is the AHJ's call on each project.
The fire and smoke damper rounds
Fire and smoke damper QuarterlyFire and smoke damper quarterly maintenance checklistAccess doors, labels and visible blade position checked on the fire and smoke dampers4 items6 photosFire and smoke damper AnnualFire and smoke damper annual maintenance checklistOperational cycle test, fusible-link condition and installation details on the deeper inspection6 items10 photos
Where each walk sits in the schedule
- Fire and smoke damper quarterly maintenance checklistquarterly
- Every quarter as an accessibility and condition round, confirming each damper can still be reached and inspected ahead of the operational cycle test. Run by: The mechanical or life-safety tech on the quarterly round through the ceilings and mechanical shafts.
- Fire and smoke damper annual maintenance checklistannual
- At the operational test interval, coordinated with the fire alarm so smoke and combination dampers can be driven from an actual signal and the HVAC shut down for the test. Run by: The damper service tech performing the operational test at the required interval, with the ceilings opened for access.
What most often fails on a fire and smoke damper
- Access door drywalled or ducted over by another trade, so the damper behind a rated wall can no longer be reached or tested at all.
- Damper labels painted over or missing, so nobody can tell a fire damper from a combination fire/smoke unit or read its rating.
- Actuator or linkage visibly disconnected but logged as 'in place' because the blades were never watched through a cycle.
- Damper 'cycled' by hand but never dropped on the link or driven from the alarm, so a spring too weak to close under airflow passes.
- Blades close but don't seat because duct debris or a bent blade leaves a gap, counted as closed without checking full closure.
- Sleeve and retaining angles wrong — oversized annular space or missing angles — so the assembly wouldn't hold the barrier's rating, never checked once the wall was closed.
Verified against
Families only, never clause numbers. Adoption varies by jurisdiction; confirm the edition your authority having jurisdiction enforces before you run a walk against it.
Common questions
- Which fire and smoke damper maintenance rounds do these checklists cover?
- Fire and smoke damper quarterly maintenance checklist (quarterly): Every quarter as an accessibility and condition round, confirming each damper can still be reached and inspected ahead of the operational cycle test. Fire and smoke damper annual maintenance checklist (annual): At the operational test interval, coordinated with the fire alarm so smoke and combination dampers can be driven from an actual signal and the HVAC shut down for the test.
- Who runs the fire and smoke damper maintenance round?
- The mechanical or life-safety tech on the quarterly round through the ceilings and mechanical shafts. The damper service tech performing the operational test at the required interval, with the ceilings opened for access.
- What most often fails on a fire and smoke damper?
- Access door drywalled or ducted over by another trade, so the damper behind a rated wall can no longer be reached or tested at all. Damper labels painted over or missing, so nobody can tell a fire damper from a combination fire/smoke unit or read its rating. Actuator or linkage visibly disconnected but logged as 'in place' because the blades were never watched through a cycle. Damper 'cycled' by hand but never dropped on the link or driven from the alarm, so a spring too weak to close under airflow passes.
- Which standards is fire and smoke damper work verified against?
- NFPA 80 & 105, published by the National Fire Protection Association. Adoption varies by jurisdiction. Confirm the edition your authority having jurisdiction enforces before you run a walk against it.
- Can I run these checklists in RTI?
- Yes. Start a free RTI workspace and load any of the 2 lists (10 items in total). The Photo Gate holds the submit button until every mandatory item is answered and its photos are attached, and approved inspections roll into a branded turnover package with a tamper-evident audit trail.
Related units and trades
- Fire department connection (FDC) maintenance checklists2
- Fire pump (electric or diesel) maintenance checklists2
- Doors, frames and hardware inspection checklists3
- Overhead and coiling doors inspection checklists3
- Fire pump jockey pump maintenance checklists2
- Fuel oil storage and day tank maintenance checklists2