Skip to content
RTI

Checklists by trade

3 lists · 14 items · 21 photos

Asphalt paving inspection checklists

Asphalt paving inspection checklists for the rough-in, final and punch walks: 3 free lists, 14 items and 21 photo requirements, each item naming what to look for and the photo that proves it.

Where each walk sits in the schedule

Asphalt paving rough-in inspection checklistrough-in
After the base is placed and graded, before any asphalt goes down — once the mat is on, a soft spot or a flat area in the base can only be fixed by tearing it back out. Run by: The GC's superintendent with the paving contractor and, where required, the testing agency, walking the prepared subgrade and base before the paver arrives.
Asphalt paving final inspection checklistfinal
After paving and rolling are complete and the mat has cooled, before striping and before the lot or drive is opened to traffic. Run by: The GC's superintendent with the paving foreman and the testing agency where cores or density are specified.
Asphalt paving punch checklistpunch
During closeout, after the surface has seen weather and traffic that reveal raveling, standing water and joint openings. Run by: The GC's superintendent with the paving contractor on a callback, often after the first heavy rains.

What most often sends asphalt paving work back

  • Base graded to line but never proof-rolled, so a soft area under the surface pumps and the mat cracks over it within a year.
  • Cross-slope set to the plan on paper but built flat in a stretch, leaving water to sheet the wrong way once the surface is smooth.
  • Compaction taken at the easy centerline and never at the edges and confined corners where the roller couldn't reach.
  • Longitudinal joint between passes left high and unsealed, so it ravels open and lets water into the base along the seam.
  • Mat that looks finished but holds birdbaths, only revealed when it rains and the low spots don't drain.
  • Thickness assumed from the tonnage delivered rather than checked, coming up short in the stretches that got paved last.
  • Birdbaths noted at final but never corrected, so they collect water and grit and start potholing at the low spot.
  • Raveling at a cold joint patched at the surface while the open joint underneath keeps taking on water.

Common questions

Which asphalt paving inspections do these checklists cover?
Asphalt paving rough-in inspection checklist (rough-in): After the base is placed and graded, before any asphalt goes down — once the mat is on, a soft spot or a flat area in the base can only be fixed by tearing it back out. Asphalt paving final inspection checklist (final): After paving and rolling are complete and the mat has cooled, before striping and before the lot or drive is opened to traffic. Asphalt paving punch checklist (punch): During closeout, after the surface has seen weather and traffic that reveal raveling, standing water and joint openings.
Who runs an asphalt paving inspection?
The GC's superintendent with the paving contractor and, where required, the testing agency, walking the prepared subgrade and base before the paver arrives. The GC's superintendent with the paving foreman and the testing agency where cores or density are specified. The GC's superintendent with the paving contractor on a callback, often after the first heavy rains.
What most often sends asphalt paving work back?
Base graded to line but never proof-rolled, so a soft area under the surface pumps and the mat cracks over it within a year. Cross-slope set to the plan on paper but built flat in a stretch, leaving water to sheet the wrong way once the surface is smooth. Compaction taken at the easy centerline and never at the edges and confined corners where the roller couldn't reach. Longitudinal joint between passes left high and unsealed, so it ravels open and lets water into the base along the seam.
Can I run these checklists in RTI?
Yes. Start a free RTI workspace and load any of the 3 lists (14 items in total). The Photo Gate holds the submit button until every mandatory item is answered and its photos are attached, and approved inspections roll into a branded turnover package with a tamper-evident audit trail.