Concrete inspection checklists for the rough-in, pre-pour and final walks: 3 free lists, 24 items and 47 photo requirements, each item naming what to look for and the photo that proves it. Work is commonly verified against ACI concrete practice; the edition in force is the AHJ's call on each project.
The concrete walks, in build order
Concrete Rough-in· ConcreteConcrete rough-in inspection checklistFormwork, reinforcement and embeds verified on the deck the morning of the pour9 items17 photosConcrete Pre-pour· ConcreteConcrete pre-pour inspection checklistThe hold-point walk before the pour buries reinforcement, embeds and vapor barrier7 items15 photosConcrete Final· ConcreteConcrete final inspection checklistStripped concrete walked for surface defects, curing and joint work before turnover8 items15 photos
Where each walk sits in the schedule
- Concrete rough-in inspection checklistrough-in
- The morning of placement, after the rebar and embed installers have signed off and before the first truck is released to pour. Run by: The concrete superintendent walking the deck with the placing crew foreman before the pump truck arrives.
- Concrete pre-pour inspection checklistpre-pour
- After reinforcement, embeds and forms are complete on a pour area, before the concrete trucks are released to site. Run by: The GC's superintendent with the concrete foreman, releasing each pour area, joined by the engineer of record or special inspector where the contract requires them.
- Concrete final inspection checklistfinal
- After forms are stripped and curing has started, before joints are cut and the slab is turned over to the next trade. Run by: The concrete superintendent or QC lead, typically the GC's superintendent for the acceptance walk.
What most often sends concrete work back
- Chairs and bolsters crushed flat under foot traffic, dropping the top mat before the pour starts.
- Sleeves and blockouts shown in a wide shot with no tape measure proving location or size.
- Formwork bracing loosened by other trades staging material against it overnight.
- Reinforcement walked in from the edge of the slab and assumed continuous through the middle.
- Embed locations scaled off a print in the field instead of laid out from control lines.
- Vapor barrier punctured by the rebar and chair work and never re-inspected.
- Honeycombing patched and painted over before it is photographed or measured.
- Curing method started late or abandoned once the crew moves to the next pour.
Verified against
Families only, never clause numbers. Adoption varies by jurisdiction; confirm the edition your authority having jurisdiction enforces before you run a walk against it.
Common questions
- Which concrete inspections do these checklists cover?
- Concrete rough-in inspection checklist (rough-in): The morning of placement, after the rebar and embed installers have signed off and before the first truck is released to pour. Concrete pre-pour inspection checklist (pre-pour): After reinforcement, embeds and forms are complete on a pour area, before the concrete trucks are released to site. Concrete final inspection checklist (final): After forms are stripped and curing has started, before joints are cut and the slab is turned over to the next trade.
- Who runs a concrete inspection?
- The concrete superintendent walking the deck with the placing crew foreman before the pump truck arrives. The GC's superintendent with the concrete foreman, releasing each pour area, joined by the engineer of record or special inspector where the contract requires them. The concrete superintendent or QC lead, typically the GC's superintendent for the acceptance walk.
- What most often sends concrete work back?
- Chairs and bolsters crushed flat under foot traffic, dropping the top mat before the pour starts. Sleeves and blockouts shown in a wide shot with no tape measure proving location or size. Formwork bracing loosened by other trades staging material against it overnight. Reinforcement walked in from the edge of the slab and assumed continuous through the middle.
- Which standards is concrete work verified against?
- ACI concrete practice, published by the American Concrete Institute. Adoption varies by jurisdiction. Confirm the edition your authority having jurisdiction enforces before you run a walk against it.
- Can I run these checklists in RTI?
- Yes. Start a free RTI workspace and load any of the 3 lists (24 items in total). The Photo Gate holds the submit button until every mandatory item is answered and its photos are attached, and approved inspections roll into a branded turnover package with a tamper-evident audit trail.