Hold point

Also called: H-point, mandatory hold point

A hold point is a hard stop written into the inspection and test plan. When the work reaches it, the crew has to stop and cannot proceed to the next step until the named party — the owner's rep, the engineer of record, the AHJ, or QC — has inspected the work and released it in writing. Unlike a witness point, silence is not permission: no sign-off means no advance.

Why it matters

Hold points sit in front of the steps you can't undo cheaply — closing a wall, pouring concrete, energizing a feeder. Putting the stop before the point of no return is what keeps a defect visible and correctable instead of buried.

How it shows up on site

The ITP lists each hold point, who releases it, and the notice the crew owes that party. The super schedules around it: request the inspection, hold the work, and don't let the next trade start until the release is recorded.

In RTI the hold point is a photo gate — the step won't clear until the required photos and the releasing party's sign-off are attached, so a hold that was skipped can't quietly close.

Knowing the term is step one. Proving it is the job.

RTI holds the submit button until every mandatory item is answered and the photos are attached, then chains the record so it can be proven untouched later.