Receiving inspection

Also called: receiving, material receiving inspection, delivery inspection

Receiving inspection is the gate at the point of delivery: before material is accepted, stored or installed, someone confirms it is the right product, the right quantity, and undamaged, and that it matches the approved submittal. It is the cheapest place to catch a wrong or damaged product, because the item is still on the truck and can be rejected before it disappears into the work. The check pairs the delivery against the packing list, the submittal and any required mill certificate or batch ticket.

Why it matters

The wrong product caught at the dock is a refused delivery; the same product caught after it is installed is a nonconformance and often a tear-out. Receiving inspection is where a substitution nobody approved, a damaged shipment, or a model number that does not match the submittal gets stopped — before it becomes concealed work.

It is also where the paper that closeout will need starts flowing. The mill certificates, batch tickets and product data that a turnover package eventually has to show are captured at receiving, tied to the lot that actually arrived, rather than reconstructed months later.

How it shows up on site

A delivery checked against the packing list and the approved submittal, damage and quantity noted, the batch ticket or mill certificate collected, and anything that does not match set aside and tagged rather than released to the crews.