First article inspection

Also called: FAI, first article

A first article inspection is a complete, feature-by-feature check of the first item off a production run or the first installation of a repeating assembly. Every dimension, material, and requirement is verified against the drawings and specification before the crew or shop is cleared to make the rest. It shares the intent of the initial phase inspection but is most often used for fabricated or manufactured items — the first weldment, the first fabricated panel, the first assembly of a kind.

Why it matters

If the first article is wrong and it isn't caught, the error is faithfully reproduced across the whole run. Inspecting one item in full — rather than sampling many later — is the cheapest place to find a bad detail, a wrong material, or a misread dimension.

What proves it

A first article is documented item by item: each requirement, the measured or observed result, and the disposition. The approved first article then serves as the reference for the production or installation that follows, and the record travels with the fabricated work into the turnover package.

Knowing the term is step one. Proving it is the job.

RTI holds the submit button until every mandatory item is answered and the photos are attached, then chains the record so it can be proven untouched later.