Search the site
Every page, checklist and standard. Try a trade (“electrical”), a moment (“rough-in”), or a code (“NFPA 13”).
27 results for “Turnover”
- Turnover packagesApproved work compiles into a branded PDF or CSV package with the audit trail attached.Product
- Verify a turnover packageCheck an RTI verification package yourself: the browser recomputes its SHA-256 chain and shows whether it is intact. Nothing is uploaded.Product
- How it worksTag, scan, inspect, review, turn over. The full loop from sticker to signed package.Product
- Inspection and test plan (ITP)How an inspection and test plan (ITP) works: hold, witness and surveillance points mapped to checklists, with photo gated evidence and turnover records.Solution
- Live demoClick through a sample RTI workspace with no sign-up: the review board, the QR tag register, turnover packages and the Photo Gate.Product
- Concrete final inspection checklistStripped concrete walked for surface defects, curing and joint work before turnoverChecklists
- Domestic water heater quarterly maintenance checklistT&P valve, venting, leaks and temperature verified on the quarterly roundChecklists
- Domestic water storage tank annual maintenance checklistInternal inspection, disinfection, turnover and record verification on annual serviceChecklists
- Drywall final inspection checklistFinish-level walk checking joints, corners and texture match under critical light before turnoverChecklists
- Electrical final inspection checklistDevices, terminations, labeling and energization before turnoverChecklists
- Fire alarm final inspection checklistAcceptance-test walk observing and documenting each device, appliance, panel function and interface before turnoverChecklists
- Fire protection final inspection checklistHeads, escutcheons, spare stock and system interface verified before the AHJ final and turnoverChecklists
- Firestopping final inspection checklistAccessible seals re-sampled and the firestopping package assembled for turnoverChecklists
- Gypsum concrete underlayment final inspection checklistThickness, hardness and cured moisture verified before floor goods go down, with the surface checked for cracksChecklists
- Hot water recirculation pump quarterly maintenance checklistLeaks, operation, check valve and delivered return temperature verified on the quarterly roundChecklists
- HVAC final inspection checklistGrilles, registers, balancing and controls verified before startup and turnoverChecklists
- Low-voltage and structured cabling final inspection checklistTerminations, labeling, rack dressing and captured test results verified in the IDF before turnoverChecklists
- Masonry final inspection checklistCompleted veneer or CMU walk checking finish, movement joints and cleaning before turnoverChecklists
- Painting final inspection checklistFinish walk checking color, sheen and coverage consistency before turnoverChecklists
- Plumbing final inspection checklistFixtures, supplies, traps and water heater set and operating before turnoverChecklists
Did not find it? Start with a tag.
Tag one area, run one walk, and see the record it leaves behind.
30-day trial · No card required