Skip to content
RTI

Checklists by equipment

2 lists · 12 items · 17 photos

Water treatment chemical feed system maintenance checklists

Water treatment chemical feed system maintenance checklists for the quarterly and annual rounds: 2 free lists, 12 items and 17 photo requirements, each item naming what to look for and the photo that proves it.

Where each walk sits in the schedule

Water treatment chemical feed system quarterly maintenance checklistquarterly
Every quarter with the cooling tower and closed-loop checks, since a dry drum or dead pump lets the loop drift untreated between visits. Run by: The water treatment service tech or maintenance mechanic on the quarterly mechanical-room round.
Water treatment chemical feed system annual maintenance checklistannual
Once a year, timed with the closed-loop and condenser-water annual so probe drift and pump output get corrected against a real sample. Run by: The water treatment service contractor on the annual service, when the loop can be sampled and the controller taken through its ranges.

What most often fails on a water treatment chemical feed system

  • Drum run empty because no one read the day-tank level, so the loop has been feeding nothing but makeup water for weeks.
  • Metering pump clicking but not moving product past a fouled injection check valve, so the reading on the drum drops while nothing reaches the water.
  • Controller in hand or off after a prior service and never returned to auto, so it stopped dosing on conductivity.
  • Metering pump output taken from the dial setting and never checked against a draw-down, so the loop is over- or under-dosed all year.
  • Conductivity probe cleaned but never checked against a reference solution, so the controller doses to a drifted number.
  • Injection quill left in place until it snaps off in the flow because scale was never cleared from it on a service.

Common questions

Which water treatment chemical feed system maintenance rounds do these checklists cover?
Water treatment chemical feed system quarterly maintenance checklist (quarterly): Every quarter with the cooling tower and closed-loop checks, since a dry drum or dead pump lets the loop drift untreated between visits. Water treatment chemical feed system annual maintenance checklist (annual): Once a year, timed with the closed-loop and condenser-water annual so probe drift and pump output get corrected against a real sample.
Who runs the water treatment chemical feed system maintenance round?
The water treatment service tech or maintenance mechanic on the quarterly mechanical-room round. The water treatment service contractor on the annual service, when the loop can be sampled and the controller taken through its ranges.
What most often fails on a water treatment chemical feed system?
Drum run empty because no one read the day-tank level, so the loop has been feeding nothing but makeup water for weeks. Metering pump clicking but not moving product past a fouled injection check valve, so the reading on the drum drops while nothing reaches the water. Controller in hand or off after a prior service and never returned to auto, so it stopped dosing on conductivity. Metering pump output taken from the dial setting and never checked against a draw-down, so the loop is over- or under-dosed all year.
Can I run these checklists in RTI?
Yes. Start a free RTI workspace and load any of the 2 lists (12 items in total). The Photo Gate holds the submit button until every mandatory item is answered and its photos are attached, and approved inspections roll into a branded turnover package with a tamper-evident audit trail.