Terrazzo flooring inspection checklists for the rough-in, final and punch walks: 3 free lists, 13 items and 22 photo requirements, each item naming what to look for and the photo that proves it. Work is commonly verified against NTMA terrazzo standards; the edition in force is the AHJ's call on each project.
The terrazzo flooring walks, in build order
Terrazzo flooring Rough-in· Terrazzo flooringTerrazzo flooring rough-in inspection checklistSubstrate, membrane and divider-strip layout verified before the underbed and matrix cover it5 items9 photosTerrazzo flooring Final· Terrazzo flooringTerrazzo flooring final inspection checklistGround and polished surface checked for aggregate exposure, pinholes and dull spots, with strips clean and the floor sealed5 items8 photosTerrazzo flooring Punch· Terrazzo flooringTerrazzo flooring punch checklistCloseout walk for cracks telegraphing at joints, dull or loose spots and strip damage from other trades3 items5 photos
Where each walk sits in the schedule
- Terrazzo flooring rough-in inspection checklistrough-in
- After the slab is placed and cured and before the underbed goes down, early enough that a high spot or a live crack can still be dealt with under the system rather than through it. Run by: The terrazzo mechanic setting strips ahead of placement, with the GC's superintendent releasing the slab.
- Terrazzo flooring final inspection checklistfinal
- After grinding, grouting and final polish and before floor protection goes down and adjacent trades traffic the surface. Run by: The GC's superintendent with the terrazzo foreman, walking the finished floor before it's protected for turnover.
- Terrazzo flooring punch checklistpunch
- During closeout after protection comes up, once other trades have finished and any slab movement has had time to show. Run by: The terrazzo foreman on a callback, or the GC's superintendent closing flooring punch before turnover.
What most often sends terrazzo flooring work back
- Divider strips laid to a convenient line instead of the control and construction joints, so slab movement cracks the field.
- Crack-suppression membrane skipped or stopped short over an active joint the terrazzo then telegraphs.
- Underbed depth pinched thin at a high spot in the slab, leaving too little matrix to grind flat.
- Pinholes from the grout coat never filled, showing up as a rash of dark specks once the floor is sealed.
- Dull spots left where the polish sequence was cut short, obvious against the sheen under corridor lighting.
- Sealer applied over a floor that wasn't fully clean, locking in haze and grinding dust.
- A crack telegraphing up through the field away from a divider strip, signed off as cosmetic when the joint below is moving.
- A loose or drummy spot tapped and noted but never cut out and re-poured before the area is released.
Verified against
Families only, never clause numbers. Adoption varies by jurisdiction; confirm the edition your authority having jurisdiction enforces before you run a walk against it.
Common questions
- Which terrazzo flooring inspections do these checklists cover?
- Terrazzo flooring rough-in inspection checklist (rough-in): After the slab is placed and cured and before the underbed goes down, early enough that a high spot or a live crack can still be dealt with under the system rather than through it. Terrazzo flooring final inspection checklist (final): After grinding, grouting and final polish and before floor protection goes down and adjacent trades traffic the surface. Terrazzo flooring punch checklist (punch): During closeout after protection comes up, once other trades have finished and any slab movement has had time to show.
- Who runs a terrazzo flooring inspection?
- The terrazzo mechanic setting strips ahead of placement, with the GC's superintendent releasing the slab. The GC's superintendent with the terrazzo foreman, walking the finished floor before it's protected for turnover. The terrazzo foreman on a callback, or the GC's superintendent closing flooring punch before turnover.
- What most often sends terrazzo flooring work back?
- Divider strips laid to a convenient line instead of the control and construction joints, so slab movement cracks the field. Crack-suppression membrane skipped or stopped short over an active joint the terrazzo then telegraphs. Underbed depth pinched thin at a high spot in the slab, leaving too little matrix to grind flat. Pinholes from the grout coat never filled, showing up as a rash of dark specks once the floor is sealed.
- Which standards is terrazzo flooring work verified against?
- NTMA terrazzo standards, published by the National Terrazzo & Mosaic Association. Adoption varies by jurisdiction. Confirm the edition your authority having jurisdiction enforces before you run a walk against it.
- Can I run these checklists in RTI?
- Yes. Start a free RTI workspace and load any of the 3 lists (13 items in total). The Photo Gate holds the submit button until every mandatory item is answered and its photos are attached, and approved inspections roll into a branded turnover package with a tamper-evident audit trail.