Skip to content
RTI

Roles & authorities

Engineer of record (EOR)

Also called: EOR

The engineer of record is the licensed professional whose seal is on a discipline's drawings — structural, mechanical, electrical or civil — and who carries design responsibility for that scope through the build. When a field condition doesn't match the drawings, or a substitution is proposed, the EOR is the one who reviews it and decides whether the change is acceptable. Their authority comes from the design contract and the license laws of the state, so it varies with the project and the jurisdiction.

Why it matters

Anything that touches design intent — a beam that lands differently, a rebar substitution, a duct route that fights structure — has to go back to the EOR of that discipline, not be resolved by the crew. Their review is what keeps the as-built matching an engineered design rather than a field guess.

On projects with special inspection, the EOR typically defines what gets inspected and to what standard, and reviews the reports against the design.

What proves it

A signed RFI response, a stamped revision, or a written field-change authorization is the record that the EOR accepted a deviation. Photos of the as-built condition tied to that approval close the loop, so a later question has an answer instead of a memory.

Standards it's verified against

Knowing the term is step one. Proving it is the job.

RTI holds the submit button until every mandatory item is answered and the photos are attached, then chains the record so it can be proven untouched later.