Means and methods

Also called: means & methods

Means and methods are the techniques, sequences, procedures and equipment a contractor chooses to actually build the work. The contract documents say what to build and to what standard; how to get there — the shoring, the pour sequence, the lift plan, the crew — is normally the contractor's responsibility, not the designer's. The distinction matters because it draws the line between what the design team is answerable for and what the builder controls.

Why it matters

Means and methods are where safety and quality risk actually live. The spec can be perfect and the work still go wrong in the sequence — a slab poured before the embeds are checked, a wall closed before firestopping. QA hold points exist precisely to interrupt the method before a bad step becomes permanent.

The line also matters for responsibility. An engineer of record who directs means and methods can take on liability that normally sits with the contractor, which is why RFIs about 'how' usually come back pointing at the builder's own choice.

How it shows up on site

A quality plan and ITP that insert hold points into the contractor's sequence — inspect before cover, before pour, before the next trade — so the builder keeps control of the method while the critical steps still get verified and recorded.