Inspector of record (IOR)

Also called: IOR, project inspector

On some project types and in some jurisdictions, the code or the owner requires a dedicated inspector assigned to the job to continuously observe the work as it's built — commonly called the inspector of record or project inspector. They watch that construction follows the approved documents, keep records of the work, and report to the building official and the architect or engineer. Whether an IOR is required, and exactly what authority they carry, is set by the adopted code and the jurisdiction — it is not a role on every job.

Why it matters

An IOR is present far more than a building inspector who visits for scheduled inspections, so they catch conditions in real time — as work is built, not at a checkpoint after. On projects where the role is required, work generally can't proceed without the IOR observing the parts they're assigned to.

The IOR reports to the building official and the design professionals rather than the contractor, which keeps their observation independent of the party doing the work.

Common mistakes

Treating the IOR's presence as a substitute for the contractor's own quality control, or assuming their role exists on a job where the code doesn't require it. Confirm from the approved documents and the AHJ whether the project carries an inspector of record and what scope they're assigned before relying on it.