A building inspector is the code official — usually from the local building department — who checks that construction meets the adopted building code and its related trade codes. They perform the scheduled inspections that gate a project: footings before the pour, framing and rough-ins before cover, and the final before occupancy. They act on behalf of the authority having jurisdiction, so what they enforce is the edition and amendments the AHJ has adopted.

How it shows up on site

Work is built to a point, an inspection is requested, and the crew waits for the inspector to pass it before closing in. A failed item is written up and has to be corrected and reinspected, which is why a missed rough-in inspection can hold a whole area open.

The building inspector's approvals are separate from special inspection and from any third-party or owner's inspections — each has its own scope, and passing one does not close the others.

Common mistakes

Covering work before it's been inspected, or scheduling the inspection before the work is actually ready. A rough-in photographed before the walls close protects you if a later question comes up, but it does not replace the inspector's sign-off.

Knowing the term is step one. Proving it is the job.

RTI holds the submit button until every mandatory item is answered and the photos are attached, then chains the record so it can be proven untouched later.