Skip to content
RTI

Quality concepts

Quality assurance (QA)

Also called: QA

Quality assurance is everything you put in place ahead of the work to make good outcomes the default: the quality control plan, the inspection and test plan, approved submittals, the sequence of hold points and the rule that a photo has to clear the gate before the next trade covers anything. QA is about the process and the system, not the finished product. It answers a different question than quality control — QA asks whether the work is set up to come out right, while QC checks whether a specific piece of installed work actually did.

Why it matters

If the only time anyone looks at quality is after the drywall is up, every miss becomes a tear-out. QA moves the attention upstream — to submittal review, pre-installation meetings, mock-ups and hold points — so predictable mistakes get caught in planning instead of at final.

On a well-run job the QA system is what lets a super trust work they did not personally watch: the plan named the checkpoints, the photos cleared the gates, and the records are there to prove it.

How it shows up on site

A quality control plan and an ITP that spell out who inspects what and when. Hold points where the next step cannot proceed until an inspection signs off. Photo gates that force a timestamped, tagged image of concealed work before it is covered.

Knowing the term is step one. Proving it is the job.

RTI holds the submit button until every mandatory item is answered and the photos are attached, then chains the record so it can be proven untouched later.