Request for information (RFI)

An RFI is how the field asks the architect or engineer to clarify something before it gets built wrong — a dimension that doesn't add up, two details that contradict each other, a spec that doesn't match the plan. It's logged, numbered and tracked, and the written answer becomes part of the contract record. RFIs are how gaps in the documents get resolved on paper instead of in the field by guesswork.

How it shows up on site

A trade hits an unbuildable or ambiguous condition, the GC writes it up with the question and usually a proposed answer, and it goes to the design team on a clock. Work in that area often pauses or gets flagged until the response comes back. The response can trigger a drawing revision, a submittal change, or a cost and schedule impact.

Why it matters

An RFI answered after the work is installed is an NCR waiting to happen. The value is in the log: an open RFI on a location is a signal not to inspect or accept that work yet, and the answered RFI is the authority the as-built revision traces back to.

Knowing the term is step one. Proving it is the job.

RTI holds the submit button until every mandatory item is answered and the photos are attached, then chains the record so it can be proven untouched later.