Drywall

Drywall punch checklist

Drywall punch is where small misses become callbacks after the crew has demobilized. This checklist walks the finished work the way the owner and the next trade will see it, with the photo that closes each item instead of a note that reopens it. Work is commonly verified against GA-216 / ASTM C840 guidance. Confirm the edition your authority having jurisdiction has adopted.

The checklist

Every item, and the photo evidence it needs

The photo count on each row is what RTI would require before the item can be submitted. Work the list here and watch the gate hold, or load it into RTI and let it enforce the real thing.

01

Common callbacks

  • Each defect photographed as found and its cause tagged

    Every hole, ding and crack shot before repair and tagged to drywall or to the trade that caused it (late device installs, cabinet setting, move-in).

  • Dings at door swings and corners filled flush

    Any dents from handles, carts and furniture filled and sanded level; a missing doorstop noted so the hit does not recur.

    No photo
  • Nail pops refastened, not just spotted over

    Any popped fastener reset with a new screw beside it and the old head recoated, not a dab of compound over the bump.

    No photo
  • Cracks at opening corners and angles re-taped

    Any hairline cracks at door heads and inside angles opened, taped and refinished; caulk or paint alone lets them return.

    No photo
02

Repair and proof

  • Each defect repaired and photographed under raking light

    A light held at a low angle across the repair so any ridge, dip or flash is visible in the photo.

  • Repair located with a wide shot

    A second photo wide enough to place the repair in the room, so closure is verifiable remotely.

  • Patched areas spot-primed before paint touch-up

    Raw compound on each repair sealed with primer so the finish coat does not flash dull over the patch.

03

Signoff

  • No remaining drywall items before room signoff

    All punch items in the room closed with photos before the room is marked complete.

  • Painter told which repaired walls are ready for touch-up

    Closed drywall repairs listed by room for the painting lead, so no primed patch is left without its finish coat.

    No photo

What usually sends this back

The failures are almost always the evidence, not the work

  • Repairs sanded without re-checking under raking light, so the flash returns with the next coat.
  • Damage from move-in and other trades logged as drywall punch with no photo to assign responsibility.

Verified against

Common questions

6 answers

What does this drywall punch checklist cover?
9 items across 3 sections, covering common callbacks, repair and proof, signoff. Each item spells out what the person walking the job is actually looking for, not just a box to tick.
Who should run this inspection?
The drywall foreman on a callback, or the GC's superintendent closing finish punch items room by room.
When in the schedule should this walk happen?
During closeout, after paint reveals every joint and corner that read fine under work lights.
Why do these items ask for a photo?
5 of the 9 items call for photo evidence, 6 photos in all. A checklist answer without the photo is a claim; the photo is what makes the record worth something in a dispute and lets a reviewer approve work without re-walking the job.
What most often fails a drywall punch inspection?
Repairs sanded without re-checking under raking light, so the flash returns with the next coat. Damage from move-in and other trades logged as drywall punch with no photo to assign responsibility.
Can I use this checklist in RTI?
Yes. Start a free RTI workspace, build this list as a checklist, and the Photo Gate holds the submit button until every mandatory item is answered and its photos are attached. Approved inspections roll into a branded turnover package with a tamper evident audit trail.

Run it with the Photo Gate

A checklist nobody can submit half-finished

Load this list into RTI, stick a QR tag on the area it covers, and the submit button stays locked until every mandatory item is answered and the 6 required photos exist. Approved walks roll into a branded turnover package with a tamper evident record behind every line.

See all 508 checklists · 6741 items and 5984 photo requirements in total.