WaterproofingWaterproofing punch checklist
Waterproofing punch is where small misses become callbacks after the crew has demobilized. This checklist walks the finished work the way the owner and the next trade will see it, with the photo that closes each item instead of a note that reopens it. Work is commonly verified against the applicable building code, manufacturer's published instructions. Confirm the edition your authority having jurisdiction has adopted.
The checklist
Every item, and the photo evidence it needs
The photo count on each row is what RTI would require before the item can be submitted. Work the list here and watch the gate hold, or load it into RTI and let it enforce the real thing.
Leak intake
Each leak report logged with location, date and weather
Room, wall or pan location, when the leak was seen and what the weather was doing, so a pattern across reports shows up.
No photoLeak symptom photographed before anything is opened
Stain, efflorescence or drip shown close up and in a wide shot before finishes, backfill or drainage board are removed.
Repair and proof
Entry point located, not just the symptom
The repair photo shows the actual breach or failed termination, with a wide shot locating it on the wall or pan.
Repair re-tested with water before closure
Localized water test or flood re-test documented on the repaired area, with the dry side photographed after.
Repair material compatible with the existing membrane
Patch, primer and sealant are the ones the manufacturer lists for repairing that membrane, not generic caulk over a breach.
Same detail checked elsewhere on the elevation
Other terminations, penetrations or drains built with the same detail on that wall or level looked at for the same failure.
Covered repair photographed before finishes go back
The finished repair shown before tile, drainage board or backfill is reinstated over it, tagged to the punch item.
Signoff
No remaining waterproofing items before area signoff
All leak and termination items closed with photos before the area is released to turnover.
Person who reported the leak told the re-test result
The owner, tenant or inspector who raised the item notified of the repair and the re-test result before it is closed.
No photo
What usually sends this back
The failures are almost always the evidence, not the work
- Leak repaired at the visible stain without tracing the actual entry point above or behind it.
- Repair photographed but never re-tested, so the punch item bounces back after the next rain.
Common questions
6 answers
- What does this waterproofing punch checklist cover?
- 9 items across 3 sections, covering leak intake, repair and proof, signoff. Each item spells out what the person walking the job is actually looking for, not just a box to tick.
- Who should run this inspection?
- The waterproofing foreman on a callback, or the GC's superintendent closing leak-related punch items.
- When in the schedule should this walk happen?
- During closeout, as leak reports and inspector comments come in. Each one is located, repaired and re-proven.
- Why do these items ask for a photo?
- 7 of the 9 items call for photo evidence, 10 photos in all. A checklist answer without the photo is a claim; the photo is what makes the record worth something in a dispute and lets a reviewer approve work without re-walking the job.
- What most often fails a waterproofing punch inspection?
- Leak repaired at the visible stain without tracing the actual entry point above or behind it. Repair photographed but never re-tested, so the punch item bounces back after the next rain.
- Can I use this checklist in RTI?
- Yes. Start a free RTI workspace, build this list as a checklist, and the Photo Gate holds the submit button until every mandatory item is answered and its photos are attached. Approved inspections roll into a branded turnover package with a tamper evident audit trail.
Related checklists
Run it with the Photo Gate
A checklist nobody can submit half-finished
Load this list into RTI, stick a QR tag on the area it covers, and the submit button stays locked until every mandatory item is answered and the 10 required photos exist. Approved walks roll into a branded turnover package with a tamper evident record behind every line.