SiteworkSitework punch checklist
Sitework punch is where small misses become callbacks after the crew has demobilized. This checklist walks the finished work the way the owner and the next trade will see it, with the photo that closes each item instead of a note that reopens it. Work is commonly verified against the project geotechnical report, the applicable building code. Confirm the edition your authority having jurisdiction has adopted.
The checklist
Every item, and the photo evidence it needs
The photo count on each row is what RTI would require before the item can be submitted. Work the list here and watch the gate hold, or load it into RTI and let it enforce the real thing.
Site walk
Walk route covers every paved area, curb run and structure
The punch walk takes in every lot, walk, curb line and drainage structure on the site plan, not only the areas near the building entrances.
No photoSoil at pavement and curb edges checked for washout
Edges of paving, backs of curb and walk edges checked for erosion or undermining from runoff, bare or rutted spots marked for stabilization.
Walks, curbs and slabs walked joint to joint for cracking
Flatwork looked over panel by panel; any crack measured, marked on the site plan and photographed with a scale so the architect can decide between sealing and replacement.
Drain inlets rechecked after landscaping and final sweeping
Grates, sumps and pipe inlets checked again for mulch, soil and sweepings washed in after landscaping and cleanup finished.
Repair and proof
Root cause corrected, not just the surface
Repair photos show the excavation or regrade, not just the new surface, with a wide shot locating it on site.
Corrected areas re-verified after the next rain or test
The repaired area photographed dry after a rain event or a water test.
Replaced concrete panels cut back to full joints
Where a panel is replaced, it is sawcut to the nearest joints, tied to its neighbors as the detail shows and finished to match the adjacent concrete.
No photo
Signoff
No remaining sitework items before site signoff
All punch items closed with photos before the site is released to landscaping or turnover.
Repair dates and methods logged for the warranty period
Each corrected sitework item listed with its repair date and method, so settlement or ponding that returns during the warranty has a baseline to compare against.
No photo
What usually sends this back
The failures are almost always the evidence, not the work
- Settled trench patched at the surface while the void underneath keeps growing.
- Ponding 'fixed' by spreading the water without re-establishing the drainage slope.
Common questions
6 answers
- What does this sitework punch checklist cover?
- 9 items across 3 sections, covering site walk, repair and proof, signoff. Each item spells out what the person walking the job is actually looking for, not just a box to tick.
- Who should run this inspection?
- The site foreman on a callback, or the GC's superintendent closing civil punch items.
- When in the schedule should this walk happen?
- During closeout, as settlement, ponding and damage items are reported, with each one corrected and re-verified.
- Why do these items ask for a photo?
- 6 of the 9 items call for photo evidence, 8 photos in all. A checklist answer without the photo is a claim; the photo is what makes the record worth something in a dispute and lets a reviewer approve work without re-walking the job.
- What most often fails a sitework punch inspection?
- Settled trench patched at the surface while the void underneath keeps growing. Ponding 'fixed' by spreading the water without re-establishing the drainage slope.
- Can I use this checklist in RTI?
- Yes. Start a free RTI workspace, build this list as a checklist, and the Photo Gate holds the submit button until every mandatory item is answered and its photos are attached. Approved inspections roll into a branded turnover package with a tamper evident audit trail.
Related checklists
Run it with the Photo Gate
A checklist nobody can submit half-finished
Load this list into RTI, stick a QR tag on the area it covers, and the submit button stays locked until every mandatory item is answered and the 8 required photos exist. Approved walks roll into a branded turnover package with a tamper evident record behind every line.