Fencing and gates final inspection is where the punch list is either short or expensive. This checklist walks the finished work the way an owner or AHJ will see it: devices on, systems running, everything labeled. Each item gets the photo that closes it instead of reopening it. Work is commonly verified against the project specifications, manufacturer's published instructions. Confirm the edition your authority having jurisdiction has adopted.

The checklist

Every item, and the photo evidence it needs

The photo count on each row is what RTI would require before the item can be submitted. Work the list here and watch the gate hold, or load it into RTI and let it enforce the real thing.

01

Fabric, panels and rails

  • Fabric or panels aligned and tensioned

    Chain-link stretched taut with tension bands and bars set, or panels seated square and level, no waves, sags or gaps at the bottom rail or ground.

  • Rails, caps and fittings aligned across the run

    Top and bottom rails continuous and level, caps and fittings tight, splices staggered, the run sighted end to end for line.

  • Fabric ties or panel brackets at the shop-drawing spacing

    Ties to line posts and rails, or panel brackets and screws, counted against the spacing on the shop drawings, tie ends twisted and turned in.

02

Gates and hardware

  • Gate swing or slide operation full travel

    Each leaf cycled through its full travel by hand, swinging or rolling free with no drag, bind or scrape, hinges and rollers carrying the weight without sagging.

  • Latches, locks and closers function

    Latches engaging cleanly, locks and drop rods seating, self-closers and stops working, gate holding closed and holding open where required.

  • Grounding and bonding in place where required

    Fence and gates grounded and bonded where the spec or proximity to power requires it, connections tight and to a clean surface.

  • Gate leaves plumb, level and square in the closed position

    Leaf at rest checked with a level, even gap to the latch post, even bottom clearance, double leaves meeting flush and on line at the center.

  • Hinges, rollers and guides fastened with the specified hardware

    Hinge and roller bolts through and tight with the fastener type the spec or manufacturer lists, guides and keepers anchored, no missing nuts or temporary clamps.

03

Gate operators

  • Operator drives, stops and holds the gate

    Powered leaf run open and closed under the operator, travel limits set, gate stopping and holding at each end without slamming or straining.

  • Entrapment and reversing safety devices proven

    Reversing edges, photo eyes and any entrapment sensors tested by obstructing the gate, the leaf stopping and reversing as the operator's instructions require, manual release working.

  • Operator installer's safety-device test record on file

    Where a powered gate is installed, the installer's written record of the safety-device setup and test, dated and signed, received before turnover.

    No photo
  • Warning placards posted on both sides of a powered gate

    Where an operator is installed, the manufacturer's warning signs mounted where users approaching from either side can read them.

    No photo
  • Operator manual, release key and gate keys turned over

    Owner's manuals, manual-release key or tool, lock keys and combinations handed to the owner's representative and the handover logged.

    No photo
04

Site restoration

  • Grade restored and spoil cleared along the finished line

    Excavated soil and concrete spill removed, ruts from equipment filled, footing crowns left visible rather than buried under backfill.

  • Fabric offcuts, tie wire and cut rail ends picked up

    Both sides of the run walked for metal scrap, tie clippings, packaging and spare fittings left in turf or planting beds.

What usually sends this back

The failures are almost always the evidence, not the work

  • Fabric or panels left loose and wavy between posts, or rails not aligned across a run, so the fence reads crooked.
  • A swing or slide gate that binds or drags at one point in its travel, adjusted until it 'mostly' works rather than swinging free.
  • A powered gate turned over without proving its reversing and entrapment sensors actually stop and reverse the leaf.

Common questions

6 answers

What does this fencing and gates final checklist cover?
15 items across 4 sections, covering fabric, panels and rails, gates and hardware, gate operators, site restoration. Each item spells out what the person walking the job is actually looking for, not just a box to tick.
Who should run this inspection?
The GC's superintendent with the fence foreman, walking the completed run and cycling every gate.
When in the schedule should this walk happen?
After fabric, panels and gates are hung and any operators are wired, before turnover and before the site is opened to traffic.
Why do these items ask for a photo?
12 of the 15 items call for photo evidence, 16 photos in all. A checklist answer without the photo is a claim; the photo is what makes the record worth something in a dispute and lets a reviewer approve work without re-walking the job.
What most often fails a fencing and gates final inspection?
Fabric or panels left loose and wavy between posts, or rails not aligned across a run, so the fence reads crooked. A swing or slide gate that binds or drags at one point in its travel, adjusted until it 'mostly' works rather than swinging free. A powered gate turned over without proving its reversing and entrapment sensors actually stop and reverse the leaf.
Can I use this checklist in RTI?
Yes. Start a free RTI workspace, build this list as a checklist, and the Photo Gate holds the submit button until every mandatory item is answered and its photos are attached. Approved inspections roll into a branded turnover package with a tamper evident audit trail.

Run it with the Photo Gate

A checklist nobody can submit half-finished

Load this list into RTI, stick a QR tag on the area it covers, and the submit button stays locked until every mandatory item is answered and the 16 required photos exist. Approved walks roll into a branded turnover package with a tamper evident record behind every line.

See all 508 checklists · 6741 items and 5984 photo requirements in total.