The metal canopies and awnings walks, in build order
Metal canopies and awnings Rough-in· Metal canopies and awningsMetal canopies and awnings rough-in inspection checklistEmbeds, backing and structural attachment set and verified against the connection detail before the wall or soffit closes over them4 items7 photosMetal canopies and awnings Final· Metal canopies and awningsMetal canopies and awnings final inspection checklistCanopy hung true and level, drainage pitched and running, and the finish and underside complete as the owner sees it3 items5 photosMetal canopies and awnings Punch· Metal canopies and awningsMetal canopies and awnings punch checklistCloseout callbacks for dented or scratched panels, drainage that still ponds, and connections that worked loose under load3 items5 photos
Where each walk sits in the schedule
- Metal canopies and awnings rough-in inspection checklistrough-in
- As embeds are cast or backing is set in the wall and the structural attachment is made, before cladding, sheathing or soffit closes over the connection. Run by: The canopy erector setting embeds and attachment, or the GC's superintendent walking each attachment point before the wall or ceiling covers it.
- Metal canopies and awnings final inspection checklistfinal
- After the canopy is hung, drainage is connected and the finish and soffit are complete, before turnover walks and before the entrance sees daily traffic. Run by: The canopy erector with the GC's superintendent, walking the hung canopy after finishes before turnover.
- Metal canopies and awnings punch checklistpunch
- During closeout, after weather has tested the drainage and after other trades and lifts have worked around the entrance. Run by: The canopy erector on a callback, or the GC's superintendent clearing canopy punch items before turnover.
What most often sends metal canopies and awnings work back
- Embed cast off layout or rotated, so the canopy bracket lands over a stud cavity instead of the embed and the connection ends up field-improvised with anchors that were never engineered.
- Backing or through-bolting into the structure skipped in favor of expansion anchors in a facade that cannot carry the cantilever, discovered when the canopy sags at the outer edge.
- Flashing and sealant left off the attachment penetration through the wall, so the anchor line becomes a water path once the cladding closes over it.
- Canopy hung with a reverse or flat pitch so water ponds on the deck or drains back to the wall instead of to the scupper or downspout, staining the facade below.
- Downspout or scupper left disconnected or dumping onto the walkway, so runoff sheets across the entrance and ices in cold weather.
- Fastener heads, sealant and finish left rough on the visible underside and fascia at the entrance, the most-seen surface on the building signed off as complete.
- A ponding spot logged and left because the deck 'mostly drains,' so leaves and grit collect at the low point and the standing water works into the seams.
- Panels dented or coating scratched by lifts and deliveries after erection, with no record of when the canopy was last verified clean and straight.
Common questions
- Which metal canopies and awnings inspections do these checklists cover?
- Metal canopies and awnings rough-in inspection checklist (rough-in): As embeds are cast or backing is set in the wall and the structural attachment is made, before cladding, sheathing or soffit closes over the connection. Metal canopies and awnings final inspection checklist (final): After the canopy is hung, drainage is connected and the finish and soffit are complete, before turnover walks and before the entrance sees daily traffic. Metal canopies and awnings punch checklist (punch): During closeout, after weather has tested the drainage and after other trades and lifts have worked around the entrance.
- Who runs a metal canopies and awnings inspection?
- The canopy erector setting embeds and attachment, or the GC's superintendent walking each attachment point before the wall or ceiling covers it. The canopy erector with the GC's superintendent, walking the hung canopy after finishes before turnover. The canopy erector on a callback, or the GC's superintendent clearing canopy punch items before turnover.
- What most often sends metal canopies and awnings work back?
- Embed cast off layout or rotated, so the canopy bracket lands over a stud cavity instead of the embed and the connection ends up field-improvised with anchors that were never engineered. Backing or through-bolting into the structure skipped in favor of expansion anchors in a facade that cannot carry the cantilever, discovered when the canopy sags at the outer edge. Flashing and sealant left off the attachment penetration through the wall, so the anchor line becomes a water path once the cladding closes over it. Canopy hung with a reverse or flat pitch so water ponds on the deck or drains back to the wall instead of to the scupper or downspout, staining the facade below.
- Can I run these checklists in RTI?