Wall and corner protection

Wall and corner protection final inspection checklist

Wall and corner protection final inspection is where the punch list is either short or expensive. This checklist walks the finished work the way an owner or AHJ will see it: devices on, systems running, everything labeled. Each item gets the photo that closes it instead of reopening it. Work is commonly verified against manufacturer's published instructions, the applicable building code. Confirm the edition your authority having jurisdiction has adopted.

Items
4
Photos required
8

Who runs it

The GC's superintendent with the wall protection installer, walking finished corridors and rooms before turnover.

When in the schedule

After the protection is fully installed on finished walls, before the owner's punch walk and before corridors open to use.

The checklist

Every item, and the photo that proves it

The photo count on each row is what RTI would require before the item can be submitted. Copy the list as is, or load it into RTI and let the gate enforce it.

01

Alignment and continuity

  • Rails, guards and panels level and plumb

    Handrails and crash rails level along the run, corner guards plumb, panels flat with even reveals, no waves or dips.

    2 photos
  • Continuous at corners, splices and transitions

    Runs continuous through inside and outside corners and at splices, end caps and transitions tight, corner arris fully covered.

    2 photos
02

Anchorage

  • Anchorage secure and pull-checked

    Fasteners landed in the backing, brackets tight, a hand pull on rails and guards confirms no give or loose sections.

    2 photos
03

Heights and clearance

  • Mounting heights and accessible clearances observed

    Rail and guard heights measured against the specified mounting heights, handrail wall clearance and clear width at corridors verified.

    2 photos

What usually sends this back

The failures are almost always the evidence, not the work

  • Handrail runs anchored into the board between blocking, tight at install but pulling loose the first time weight is put on them.
  • Corner guards stopped short or misaligned at a splice, leaving the arris of the corner exposed above or below the guard.
  • Rails set to a comfortable height by eye instead of the specified mounting height, and the accessible clearance at the wall comes up short.

Run it with the Photo Gate

A checklist nobody can submit half-finished

Load this list into RTI, stick a QR tag on the area it covers, and the submit button stays locked until every mandatory item is answered and the 8 required photos exist. Approved walks roll into a branded turnover package with a tamper-evident record behind every line.

Submission state

Mandatory items answered4 of 4
Photos attached5 of 8
Submit locked, 3 photos missing

The gate is enforced on the server, so it holds even if the phone is offline when the walk happens.

Common questions

What does this wall and corner protection final checklist cover?
4 items across 3 sections, covering alignment and continuity, anchorage, heights and clearance. Each item spells out what the person walking the job is actually looking for, not just a box to tick.
Who should run this inspection?
The GC's superintendent with the wall protection installer, walking finished corridors and rooms before turnover.
When in the schedule should this walk happen?
After the protection is fully installed on finished walls, before the owner's punch walk and before corridors open to use.
Why does every item ask for a photo?
8 of the 4 items call for photo evidence. A checklist answer without the photo is a claim; the photo is what makes the record worth something in a dispute and lets a reviewer approve work without re-walking the job.
What most often fails a wall and corner protection final inspection?
Handrail runs anchored into the board between blocking, tight at install but pulling loose the first time weight is put on them. Corner guards stopped short or misaligned at a splice, leaving the arris of the corner exposed above or below the guard. Rails set to a comfortable height by eye instead of the specified mounting height, and the accessible clearance at the wall comes up short.
Can I use this checklist in RTI?
Yes. Start a free RTI workspace, build this list as a checklist, and the Photo Gate holds the submit button until every mandatory item is answered and its photos are attached. Approved inspections roll into a branded turnover package with a tamper-evident audit trail.