Construction change directive (CCD)

Also called: CCD

A construction change directive is how an owner keeps work moving when a change is needed but the cost and schedule adjustment isn't settled yet. It directs the contractor to proceed on the changed scope, with the price and time to be determined and reconciled later — typically converting to a formal change order once agreed. It exists precisely so a pricing negotiation doesn't stall the field.

Why it matters

The CCD protects the schedule while protecting the contractor's right to be paid for the change. Because the number isn't locked, tracking the actual cost and time of the directed work — labor, material, the conditions encountered — is what the eventual change order is built from. Thin records here mean leaving money on the table when the CCD is reconciled.

How it shows up on site

A CCD reads like a change order that's missing the agreed price, and it should be logged and tracked the same way. Documenting the directed work as it's performed — including photos of the field condition that drove it — is what turns a disputed reconciliation into a supported one.

Knowing the term is step one. Proving it is the job.

RTI holds the submit button until every mandatory item is answered and the photos are attached, then chains the record so it can be proven untouched later.