Change order

Also called: CO

A change order is the formal, executed document that modifies the contract — adding or deleting scope and adjusting the contract sum and completion date accordingly. It's signed by both the owner and the contractor, which is what separates it from a directive: a change order reflects agreement on the change and its cost and time impact. It usually originates from an RFI answer, a design revision, an owner request, or a discovered field condition.

Why it matters

Change orders are the paper trail for how a job's scope and price actually evolved from the original contract. Performing changed work without one — on a verbal instruction or an unpriced directive — is one of the surest ways to end up unpaid or in dispute over what was authorized.

How it shows up on site

An executed change order updates the schedule of values so the added scope can be billed, and it feeds the as-built record when it moves something from where the plans showed it. A change directed but not yet agreed on price rides as a construction change directive until the number is settled.

Knowing the term is step one. Proving it is the job.

RTI holds the submit button until every mandatory item is answered and the photos are attached, then chains the record so it can be proven untouched later.