Preparatory phase inspection

Also called: prep meeting, preparatory meeting

The preparatory phase inspection is the meeting held before a definable feature of work starts. QC, the foreman, and often the owner's rep sit down to confirm the submittals are approved, the right materials are on site, the crew understands the acceptance criteria, and the preceding work is ready to build on. It is the first of the three phases of control, and its whole purpose is to catch problems on paper before they become problems in place.

Why it matters

Most rework traces back to something known before the first fastener went in: an unapproved substitution, a missing detail, a surface that wasn't ready. The prep phase forces those to the surface while they're still cheap to fix.

What proves it

The record shows who attended, which submittals and standards were reviewed, the material delivered and its condition, and any items to resolve before work begins. In RTI the prep review is a step on the feature's checklist, so the photos of delivered material and the reviewed criteria are attached before the initial phase can open.

Knowing the term is step one. Proving it is the job.

RTI holds the submit button until every mandatory item is answered and the photos are attached, then chains the record so it can be proven untouched later.