The initial phase inspection happens when the crew has completed the first portion of a definable feature of work. QC checks that first run against the acceptance criteria in detail — layout, workmanship, tolerances, the things that will repeat across the whole feature. It is the second of the three phases of control, and it sets the benchmark: this is what "good" looks like for the rest of the work.

Why it matters

Correcting the first ten feet of a run is a conversation; correcting the whole feature after it's built out is a change order. The initial phase locks in the standard and the methods before the crew multiplies a mistake down the line.

How it shows up on site

QC walks the first completed section with the foreman, measures it against the criteria set in the prep phase, and agrees on the acceptable result. From there the follow-up phase keeps the rest of the work honest against that benchmark.

Knowing the term is step one. Proving it is the job.

RTI holds the submit button until every mandatory item is answered and the photos are attached, then chains the record so it can be proven untouched later.