Casework and millwork

Casework and millwork final inspection checklist

Casework and millwork final inspection is where the punch list is either short or expensive. This checklist walks the finished work the way an owner or AHJ will see it: devices on, systems running, everything labeled. Each item gets the photo that closes it instead of reopening it. Work is commonly verified against AWI / architectural woodwork standards, manufacturer's published instructions. Confirm the edition your authority having jurisdiction has adopted.

Items
5
Photos required
9

Who runs it

The GC's superintendent with the casework foreman, walking each installed run before the owner's punch walk.

When in the schedule

After casework is set and countertops are in, before turnover and before the room is loaded with fixtures and contents.

The checklist

Every item, and the photo that proves it

The photo count on each row is what RTI would require before the item can be submitted. Copy the list as is, or load it into RTI and let the gate enforce it.

01

Setting and anchorage

  • Runs level, plumb and scribed to the walls

    Cabinet faces and tops level and plumb across the run, scribes tight to the wall and floor, fillers cut so the reveal stays even.

    2 photos
  • Casework anchored into blocking, not board alone

    Fasteners landing in the blocking or framing at the cleats and cabinet backs, uppers pulled firmly to the wall with no movement when tugged.

    2 photos
02

Doors, drawers and hardware

  • Doors and drawers aligned and operating

    Reveals even top and bottom, doors closing flush without rubbing, drawers running smoothly and self-closing where specified.

    2 photos
  • Hardware installed complete and consistent

    Pulls and knobs on consistent centers, hinges and slides adjusted, locks and any specified accessories present and working.

    1 photo
03

Countertops

  • Countertop seams and support checked

    Seams tight and flush, tops fully supported at cutouts and overhangs, no flex or rock when pressed at the seam or the front edge.

    2 photos

What usually sends this back

The failures are almost always the evidence, not the work

  • Cabinet run leveled front-to-back but not scribed to a wavy wall, leaving a tapering gap the caulk can't hide.
  • Uppers hung to the drywall alone where the blocking was missed, holding until they are loaded and then pulling out.
  • Countertop seam set over an unsupported gap, so it flexes and the joint opens at the first heavy lean.

Run it with the Photo Gate

A checklist nobody can submit half-finished

Load this list into RTI, stick a QR tag on the area it covers, and the submit button stays locked until every mandatory item is answered and the 9 required photos exist. Approved walks roll into a branded turnover package with a tamper-evident record behind every line.

Submission state

Mandatory items answered5 of 5
Photos attached6 of 9
Submit locked, 3 photos missing

The gate is enforced on the server, so it holds even if the phone is offline when the walk happens.

Common questions

What does this casework and millwork final checklist cover?
5 items across 3 sections, covering setting and anchorage, doors, drawers and hardware, countertops. Each item spells out what the person walking the job is actually looking for, not just a box to tick.
Who should run this inspection?
The GC's superintendent with the casework foreman, walking each installed run before the owner's punch walk.
When in the schedule should this walk happen?
After casework is set and countertops are in, before turnover and before the room is loaded with fixtures and contents.
Why does every item ask for a photo?
9 of the 5 items call for photo evidence. A checklist answer without the photo is a claim; the photo is what makes the record worth something in a dispute and lets a reviewer approve work without re-walking the job.
What most often fails a casework and millwork final inspection?
Cabinet run leveled front-to-back but not scribed to a wavy wall, leaving a tapering gap the caulk can't hide. Uppers hung to the drywall alone where the blocking was missed, holding until they are loaded and then pulling out. Countertop seam set over an unsupported gap, so it flexes and the joint opens at the first heavy lean.
Can I use this checklist in RTI?
Yes. Start a free RTI workspace, build this list as a checklist, and the Photo Gate holds the submit button until every mandatory item is answered and its photos are attached. Approved inspections roll into a branded turnover package with a tamper-evident audit trail.