Elevator installation final inspection checklist

Elevator installation final inspection is where the punch list is either short or expensive. This checklist walks the finished work the way an owner or AHJ will see it: devices on, systems running, everything labeled. Each item gets the photo that closes it instead of reopening it. Work is commonly verified against ASME A17.1 safety code for elevators and escalators, the applicable building code. Confirm the edition your authority having jurisdiction has adopted.

Items
5
Photos required
10

Who runs it

The licensed elevator mechanic runs the car and the acceptance test; the RTI user and GC superintendent observe and record alongside the AHJ or authorized inspector.

When in the schedule

After the car, doors and fixtures are installed and adjusted, at the acceptance test the AHJ attends before the elevator is placed in service.

The checklist

Every item, and the photo that proves it

The photo count on each row is what RTI would require before the item can be submitted. Copy the list as is, or load it into RTI and let the gate enforce it.

01

Car and leveling

  • Car leveling observed at each landing

    Car floor to sill checked flush within tolerance at every landing served, not just the lobby, and noted.

    2 photos
  • Car finishes, fixtures and signals installed

    Car operating panel, position indicators, lighting, handrail and phone present and operating, finishes undamaged.

    1 photo
02

Doors and protection

  • Hoistway and car doors operate and interlock

    Doors open, close and dwell correctly, hoistway doors stay locked away from the landing, no door forced open at a stop.

    2 photos
  • Door protection and reopening device work

    Reopening device tested at high and low, an obstruction in the opening reopens the doors before they close on it.

    2 photos
03

Acceptance test

  • Acceptance test witnessed with the AHJ and recorded

    The mechanic runs the test with the AHJ or authorized inspector present; the RTI user photographs and records what is observed rather than certifying the result.

    3 photos

What usually sends this back

The failures are almost always the evidence, not the work

  • Car leveling checked at one busy landing and assumed good at the rest, so a step-off lip is left at an upper floor.
  • Door reopening device tested with a hand at waist height but never low, missing an obstruction near the sill.
  • The RTI user writing that the elevator 'passed' when the acceptance test is the mechanic's and the AHJ's to certify, not the user's.

Run it with the Photo Gate

A checklist nobody can submit half-finished

Load this list into RTI, stick a QR tag on the area it covers, and the submit button stays locked until every mandatory item is answered and the 10 required photos exist. Approved walks roll into a branded turnover package with a tamper-evident record behind every line.

Submission state

Mandatory items answered5 of 5
Photos attached7 of 10
Submit locked, 3 photos missing

The gate is enforced on the server, so it holds even if the phone is offline when the walk happens.

Verified against

Common questions

What does this elevator installation final checklist cover?
5 items across 3 sections, covering car and leveling, doors and protection, acceptance test. Each item spells out what the person walking the job is actually looking for, not just a box to tick.
Who should run this inspection?
The licensed elevator mechanic runs the car and the acceptance test; the RTI user and GC superintendent observe and record alongside the AHJ or authorized inspector.
When in the schedule should this walk happen?
After the car, doors and fixtures are installed and adjusted, at the acceptance test the AHJ attends before the elevator is placed in service.
Why does every item ask for a photo?
10 of the 5 items call for photo evidence. A checklist answer without the photo is a claim; the photo is what makes the record worth something in a dispute and lets a reviewer approve work without re-walking the job.
What most often fails a elevator installation final inspection?
Car leveling checked at one busy landing and assumed good at the rest, so a step-off lip is left at an upper floor. Door reopening device tested with a hand at waist height but never low, missing an obstruction near the sill. The RTI user writing that the elevator 'passed' when the acceptance test is the mechanic's and the AHJ's to certify, not the user's.
Can I use this checklist in RTI?
Yes. Start a free RTI workspace, build this list as a checklist, and the Photo Gate holds the submit button until every mandatory item is answered and its photos are attached. Approved inspections roll into a branded turnover package with a tamper-evident audit trail.