Commercial kitchen exhaust hood quarterly maintenance checklist

A quarterly kitchen exhaust hood round is short on purpose: it catches the wear items that fail between annual services. This checklist is sized for a tech with a phone. Every item says what to look at and the photo that proves the round happened. Work is commonly verified against NFPA 96, manufacturer's published instructions. Confirm the edition your authority having jurisdiction has adopted.

Items
4
Photos required
6

Who runs it

The kitchen exhaust cleaning tech or building maintenance on the quarterly round.

When in the schedule

Every quarter, more often over a high-volume or wok/char line where grease loads the filters in weeks, not months.

The checklist

Every item, and the photo that proves it

The photo count on each row is what RTI would require before the item can be submitted. Copy the list as is, or load it into RTI and let the gate enforce it.

01

Filters and grease containment

  • Grease baffle filters pulled, cleaned and refitted

    Baffles removed and degreased, no missing filters leaving open slots, refitted tight and angled so grease drains back to the trough.

    2 photos
  • Grease trough and drip cup emptied

    Continuous trough and removable cup drained and wiped, cup seated so it isn't overflowing down the hood face or onto the cook line.

    1 photo
02

Capture at the cook line

  • Capture checked across the cooking line

    Smoke or steam off the appliances drawn into the hood along the full length, no roll-out at the ends of the line or over the busiest burner.

    1 photo
03

Exhaust fan

  • Rooftop exhaust fan running and containment intact

    Fan pulling and free of unusual noise or vibration, grease catch cup on the fan base in place and not overflowing onto the roof.

    2 photos

What usually sends this back

The failures are almost always the evidence, not the work

  • Baffle filters run through the dish machine and slotted back with two missing, leaving an open gap that pulls grease straight past into the plenum.
  • Drip cup emptied at the hood but the fan-base grease cup on the roof forgotten until it's running down the membrane.
  • Capture checked with the line cold, so nobody sees the roll-out that only happens once every burner is fired at lunch.

Run it with the Photo Gate

A checklist nobody can submit half-finished

Load this list into RTI, stick a QR tag on the area it covers, and the submit button stays locked until every mandatory item is answered and the 6 required photos exist. Approved walks roll into a branded turnover package with a tamper-evident record behind every line.

Submission state

Mandatory items answered4 of 4
Photos attached3 of 6
Submit locked, 3 photos missing

The gate is enforced on the server, so it holds even if the phone is offline when the walk happens.

Verified against

Common questions

What does this commercial kitchen exhaust hood quarterly checklist cover?
4 items across 3 sections, covering filters and grease containment, capture at the cook line, exhaust fan. Each item spells out what the person walking the job is actually looking for, not just a box to tick.
Who should run this inspection?
The kitchen exhaust cleaning tech or building maintenance on the quarterly round.
When in the schedule should this walk happen?
Every quarter, more often over a high-volume or wok/char line where grease loads the filters in weeks, not months.
Why does every item ask for a photo?
6 of the 4 items call for photo evidence. A checklist answer without the photo is a claim; the photo is what makes the record worth something in a dispute and lets a reviewer approve work without re-walking the job.
What most often fails a commercial kitchen exhaust hood quarterly inspection?
Baffle filters run through the dish machine and slotted back with two missing, leaving an open gap that pulls grease straight past into the plenum. Drip cup emptied at the hood but the fan-base grease cup on the roof forgotten until it's running down the membrane. Capture checked with the line cold, so nobody sees the roll-out that only happens once every burner is fired at lunch.
Can I use this checklist in RTI?