The annual PRV station service is the deep pass: the measurements, cleanings and tests a quarterly round doesn't reach. This checklist keeps the full service on record with the photos that make it defensible later. Work is commonly verified against IPC / UPC plumbing codes, manufacturer's published instructions. Confirm the edition your authority having jurisdiction has adopted.

Items
4
Photos required
6

Who runs it

The plumbing service tech on the annual station service.

When in the schedule

Once a year, when the station can be isolated section by section so the relief, bypass and each parallel valve get exercised.

The checklist

Every item, and the photo that proves it

The photo count on each row is what RTI would require before the item can be submitted. Copy the list as is, or load it into RTI and let the gate enforce it.

01

Protection devices

  • Relief valve exercised and reseats clean

    Reduced-side relief lifted, flows and reseats without weeping, discharge line clear and terminated correctly.

    2 photos
  • Bypass valve stroked and holds

    Bypass fully opened and closed, no seizing, seat holds tight when closed so it isn't feeding around the PRV.

    1 photo
02

Valve service

  • Each PRV checked for seat wear and adjusted to setpoint

    Valve exercised, seat and diaphragm condition checked where accessible, downstream pressure trimmed back to the intended setpoint and confirmed stable.

    2 photos
03

Parallel staging where fitted

  • Lead-lag setpoints staged so both valves share load

    On parallel PRVs the lag valve set below the lead so it opens on higher demand, each confirmed carrying flow rather than one doing all the work.

    1 photo

What usually sends this back

The failures are almost always the evidence, not the work

  • Relief valve on the reduced side never lifted, so if the PRV fails wide open the downstream piping has no real protection.
  • Bypass valve seized because it hasn't been stroked in years, leaving no way to keep water on during a valve rebuild.
  • On a parallel set the lead valve carries everything while the lag PRV is set wrong and never picks up, so one valve wears out early.

Run it with the Photo Gate

A checklist nobody can submit half-finished

Load this list into RTI, stick a QR tag on the area it covers, and the submit button stays locked until every mandatory item is answered and the 6 required photos exist. Approved walks roll into a branded turnover package with a tamper-evident record behind every line.

Submission state

Mandatory items answered4 of 4
Photos attached3 of 6
Submit locked, 3 photos missing

The gate is enforced on the server, so it holds even if the phone is offline when the walk happens.

Verified against

Common questions

What does this pressure-reducing valve station annual checklist cover?
4 items across 3 sections, covering protection devices, valve service, parallel staging where fitted. Each item spells out what the person walking the job is actually looking for, not just a box to tick.
Who should run this inspection?
The plumbing service tech on the annual station service.
When in the schedule should this walk happen?
Once a year, when the station can be isolated section by section so the relief, bypass and each parallel valve get exercised.
Why does every item ask for a photo?
6 of the 4 items call for photo evidence. A checklist answer without the photo is a claim; the photo is what makes the record worth something in a dispute and lets a reviewer approve work without re-walking the job.
What most often fails a pressure-reducing valve station annual inspection?
Relief valve on the reduced side never lifted, so if the PRV fails wide open the downstream piping has no real protection. Bypass valve seized because it hasn't been stroked in years, leaving no way to keep water on during a valve rebuild. On a parallel set the lead valve carries everything while the lag PRV is set wrong and never picks up, so one valve wears out early.
Can I use this checklist in RTI?
Yes. Start a free RTI workspace, build this list as a checklist, and the Photo Gate holds the submit button until every mandatory item is answered and its photos are attached. Approved inspections roll into a branded turnover package with a tamper-evident audit trail.