The annual PRV station service is the deep pass: the measurements, cleanings and tests a quarterly round doesn't reach. This checklist keeps the full service on record with the photos that make it defensible later. Work is commonly verified against IPC / UPC plumbing codes, manufacturer's published instructions. Confirm the edition your authority having jurisdiction has adopted.
The checklist
Every item, and the photo evidence it needs
The photo count on each row is what RTI would require before the item can be submitted. Work the list here and watch the gate hold, or load it into RTI and let it enforce the real thing.
Notice and as-found
Owner and occupants warned before downstream pressure is disturbed
Owner, occupants and any pressure-sensitive process users told when the zone may see low or swinging pressure, and the work timed away from peak draw.
No photoArrival pressures recorded before any adjustment
Inlet, flowing and no-flow reduced-side pressures read and photographed before anything is touched, so the as-left figures compare to where the valve really was.
Station gauges checked against a calibrated test gauge
Each station gauge compared with a calibrated test gauge at the same tap, and any gauge outside its stated accuracy replaced before setpoints are trimmed.
Protection devices
Relief valve exercised and reseats clean
Reduced-side relief lifted, flows and reseats without weeping, discharge line clear and terminated correctly.
No photoBypass valve stroked and holds
Bypass fully opened and closed, no seizing, seat holds tight when closed so it isn't feeding around the PRV.
No photoRelief setting on its tag checked above the PRV setpoint
Where the station has a relief valve, its tag shows a set pressure above the PRV setpoint and within the downstream design limit, as the drawings or engineer set it.
No photo
Valve service
Valve isolated, tagged and bled to zero before it is opened
Inlet and outlet shut and tagged under the site's procedure, the zone carried by a parallel valve, an attended bypass or an agreed shutdown, and the gauge at zero first.
Strainer screen pulled and cleaned with the station isolated
Deeper than the quarterly blow-down: screen removed, cleaned and checked for tears or collapse, cap gasket inspected and the cap reseated.
Diaphragm, disc and seals renewed on the manufacturer's schedule
Soft parts replaced where the manufacturer's rebuild interval or the wear found calls for it, and the kit and parts used recorded against the valve.
No photoValve closed up and repressurized slowly before setting
Bonnet bolts torqued to the manufacturer's value, tags removed by whoever hung them, isolation valves reopened slowly, air vented downstream and every opened joint dry.
Each PRV checked for seat wear and adjusted to setpoint
Valve exercised, seat and diaphragm condition checked where accessible, downstream pressure trimmed back to the intended setpoint and confirmed stable.
Parallel staging where fitted
Lead-lag setpoints staged so both valves share load
On parallel PRVs the lag valve set below the lead so it opens on higher demand, each confirmed carrying flow rather than one doing all the work.
No photoEach staged valve proven to hold the zone alone
On parallel or staged sets, each valve isolated in turn while the other holds the zone at setpoint, so either can carry it during the other's rebuild.
No photo
Return to service
Owner told the zone is back at normal pressure
Inlet and outlet open, bypass shut, and the owner or building manager told the zone is restored, with what was found and replaced.
No photoAs-left pressures and gauge swaps filed as the new baseline
As-left setpoints, the relief setting and any gauge replacements written to the station record, so next year's service reads against them.
No photo
What usually sends this back
The failures are almost always the evidence, not the work
- Relief valve on the reduced side never lifted, so if the PRV fails wide open the downstream piping has no real protection.
- Bypass valve seized because it hasn't been stroked in years, leaving no way to keep water on during a valve rebuild.
- On a parallel set the lead valve carries everything while the lag PRV is set wrong and never picks up, so one valve wears out early.
Verified against
Common questions
6 answers
- What does this pressure-reducing valve station annual checklist cover?
- 15 items across 5 sections, covering notice and as-found, protection devices, valve service, parallel staging where fitted, and more. Each item spells out what the person walking the job is actually looking for, not just a box to tick.
- Who should run this inspection?
- The plumbing service tech on the annual station service.
- When in the schedule should this walk happen?
- Once a year, when the station can be isolated section by section so the relief, bypass and each parallel valve get exercised.
- Why do these items ask for a photo?
- 6 of the 15 items call for photo evidence, 7 photos in all. A checklist answer without the photo is a claim; the photo is what makes the record worth something in a dispute and lets a reviewer approve work without re-walking the job.
- What most often fails a pressure-reducing valve station annual inspection?
- Relief valve on the reduced side never lifted, so if the PRV fails wide open the downstream piping has no real protection. Bypass valve seized because it hasn't been stroked in years, leaving no way to keep water on during a valve rebuild. On a parallel set the lead valve carries everything while the lag PRV is set wrong and never picks up, so one valve wears out early.
- Can I use this checklist in RTI?
- Yes. Start a free RTI workspace, build this list as a checklist, and the Photo Gate holds the submit button until every mandatory item is answered and its photos are attached. Approved inspections roll into a branded turnover package with a tamper evident audit trail.
Run it with the Photo Gate
A checklist nobody can submit half-finished