Radiant heating manifold annual maintenance checklist
The annual radiant heating manifold service is the deep pass: the measurements, cleanings and tests a quarterly round doesn't reach. This checklist keeps the full service on record with the photos that make it defensible later. Work is commonly verified against IMC (mechanical code), manufacturer's published instructions. Confirm the edition your authority having jurisdiction has adopted.
The checklist
Every item, and the photo evidence it needs
The photo count on each row is what RTI would require before the item can be submitted. Work the list here and watch the gate hold, or load it into RTI and let it enforce the real thing.
Shutdown and isolation
Occupants told which floors go cool and drain hoses run
Owner and occupants told which zones are off and for how long, water let cool before draining, purge hoses run to a drain or container clear of finishes.
No photoCirculator, zone controller and any mixing station locked and tagged
Every power source feeding the manifold locked by each worker; refilled and vented, then the temporary release for hot checks (people clear, locks off by their owners), re-locked before hands go in.
Purge and flush
Each loop isolated and purged clear of air and debris
Loops purged one at a time to the drain until the water runs clear and air-free, isolation and purge valves operating without seizing.
System water and treatment checked
Fill water and treatment confirmed against the manufacturer's guidance, no visible rust or sludge in the purge stream, glycol condition logged where used.
System refilled to the cold-fill pressure after the purge
Fill valve or makeup brings the system back to its cold-fill setting on the manifold gauge, vents bled again, no loop left drained or valved off.
Actuators and circulator
Zone controller terminations checked before power returns
Torque-verified at the transformer primary, low-voltage leads at the wiring center and actuators checked secure, no heat marks or pinched cable, before the temporary release.
Every actuator removed, seat checked and re-cycled
Actuators pulled and the valve pins move freely by hand, seats clean, actuators reseated and confirmed cycling on a call.
Circulator and mixing valve exercised through range
Pump runs smooth with no bearing noise, mixing valve driven through its range and holding the supply temperature it targets.
No photoFloor supply high limit tested where a limit control is fitted
Limit tripped through its own test function or a setpoint change, hot water to the floor stopped, then reset; test kept short so no floor overheats.
No photo
Balance
Manifold rebalanced to the loop schedule after purging
Each flow meter set to its scheduled flow with the system hot and running, settings recorded on the manifold log, no loop left starved.
Return temperature compared at every loop port after balancing
Each loop's return port read with an IR thermometer once the system settles, a loop running much colder than its neighbors traced for air or blockage.
Controls and return to service
Each thermostat opens only the loops tagged for its room
One zone raised at a time, only the actuators on that room's tagged loops open, any mismatch in wiring or tags recorded and the loop schedule updated.
Floor surface temperatures surveyed in every zone
Beyond the quarterly spot read, each zone scanned with an IR camera once up to temperature, against the surface limit and last year's survey, cold areas noted.
Locks removed by whoever hung them and zones returned to auto
Locks and tags removed by the person who applied them, pump and heat source in auto, thermostats back to the owner's setpoints, drain hoses off and caps on.
No photoLoop flows, temperatures and floor changes recorded for the owner
Final flow per loop, temperatures, pressure, water treatment result and any reported floor covering changes recorded against the manifold tag, repairs listed.
No photo
What usually sends this back
The failures are almost always the evidence, not the work
- Loops rebalanced by the flow meters without purging first, so an airlocked loop reads fine cold and starves once running.
- Fill and system water never checked for treatment, and sludge quietly fouls the flow meters and actuator seats.
Verified against
Common questions
6 answers
- What does this radiant heating manifold annual checklist cover?
- 15 items across 5 sections, covering shutdown and isolation, purge and flush, actuators and circulator, balance, and more. Each item spells out what the person walking the job is actually looking for, not just a box to tick.
- Who should run this inspection?
- The hydronic service lead on the annual heating service before the season.
- When in the schedule should this walk happen?
- Once a year ahead of the heating season, paired with the boiler service so the whole loop is down at once.
- Why do these items ask for a photo?
- 10 of the 15 items call for photo evidence, 12 photos in all. A checklist answer without the photo is a claim; the photo is what makes the record worth something in a dispute and lets a reviewer approve work without re-walking the job.
- What most often fails a radiant heating manifold annual inspection?
- Loops rebalanced by the flow meters without purging first, so an airlocked loop reads fine cold and starves once running. Fill and system water never checked for treatment, and sludge quietly fouls the flow meters and actuator seats.
- Can I use this checklist in RTI?
- Yes. Start a free RTI workspace, build this list as a checklist, and the Photo Gate holds the submit button until every mandatory item is answered and its photos are attached. Approved inspections roll into a branded turnover package with a tamper evident audit trail.
Run it with the Photo Gate
A checklist nobody can submit half-finished
Load this list into RTI, stick a QR tag on the area it covers, and the submit button stays locked until every mandatory item is answered and the 12 required photos exist. Approved walks roll into a branded turnover package with a tamper evident record behind every line.
See all 508 checklists · 6741 items and 5984 photo requirements in total.