Attic stock

Also called: spare materials, extra stock

Attic stock is the surplus material a contractor turns over to the owner at closeout — extra tile, paint, ceiling panels, flooring, filters, and similar consumables — so future repairs match the original installation without hunting for a discontinued product. Quantities are specified in the contract documents, often as a percentage of the installed material or a set count. It is a closeout deliverable, and shortfalls are a common punch-out item.

Why it matters

Finishes get discontinued, dye lots change, and an exact match years later is often impossible. Attic stock is the owner's insurance that a damaged panel or a repainted wall will match the rest of the building instead of standing out. Handed over cleanly, it saves the owner a sourcing headache; forgotten, it becomes a hold on final acceptance.

What proves it

The evidence is a documented delivery: the required materials, in the specified quantities, labeled and stored where the owner agreed, with a signed receipt or inventory. Tying each item back to the specification quantity and capturing the handover keeps a shortfall from surfacing later as a disputed closeout item.

Knowing the term is step one. Proving it is the job.

RTI holds the submit button until every mandatory item is answered and the photos are attached, then chains the record so it can be proven untouched later.