Turnover & closeout
Attic stock
Also called: spare materials, extra stock
Attic stock is the surplus material a contractor turns over to the owner at closeout — extra tile, paint, ceiling panels, flooring, filters, and similar consumables — so future repairs match the original installation without hunting for a discontinued product. Quantities are specified in the contract documents, often as a percentage of the installed material or a set count. It is a closeout deliverable, and shortfalls are a common punch-out item.
Why it matters
Finishes get discontinued, dye lots change, and an exact match years later is often impossible. Attic stock is the owner's insurance that a damaged panel or a repainted wall will match the rest of the building instead of standing out. Handed over cleanly, it saves the owner a sourcing headache; forgotten, it becomes a hold on final acceptance.
What proves it
The evidence is a documented delivery: the required materials, in the specified quantities, labeled and stored where the owner agreed, with a signed receipt or inventory. Tying each item back to the specification quantity and capturing the handover keeps a shortfall from surfacing later as a disputed closeout item.
Checklists that put attic stock to work
Free, field-ready checklists, each with the photo every item needs before it can be submitted.
Related terms
- Closeout packageThe compiled record proving the work was completed, inspected, and accepted, assembled to close out the contract.
- Turnover packageThe set of documents and records handed to the owner or operator so they can run and maintain the completed building.
- Project closeoutThe end-of-project phase that finishes the work, assembles the records, and settles the contract to formally close the job.
- Record documentsThe maintained set of drawings, specs, and submittals marked up to reflect how the project was actually built.
- Substantial completionThe milestone where the work is usable for its intended purpose, even with minor punch items still open.
- Certificate of occupancy (CO)The document the building department issues confirming a completed building is code-compliant and legal to occupy.