Record documents

Also called: project record documents

Record documents are the project's contract drawings, specifications, addenda, change orders, and approved submittals, kept current through construction to show what was actually installed rather than what was originally drawn. They are the source the as-built drawings are prepared from and a standard closeout deliverable. What is required and how it is delivered — marked-up paper, updated files, or a model — is set by the contract.

Why it matters

Buildings never get built exactly as drawn — a run gets rerouted, a device relocates, a detail changes in the field. Record documents are how the next person to open a wall or troubleshoot a system knows what is really there. Kept current as work proceeds, they are accurate; reconstructed from memory at the end, they are a guess.

How it shows up on site

The field set is marked up continuously as changes happen — rerouted lines, revised details, substituted equipment — so the redlines reflect reality by the time they are formalized into as-builts. Photos taken before cover-up are a reliable backup for what ended up behind finishes.

At closeout the maintained set feeds the as-built drawings and becomes part of what the owner receives to operate and modify the building later.