The annual air compressor service is the deep pass: the measurements, cleanings and tests a quarterly round doesn't reach. This checklist keeps the full service on record with the photos that make it defensible later. Work is commonly verified against manufacturer's published instructions. Confirm the edition your authority having jurisdiction has adopted.

The checklist

Every item, and the photo evidence it needs

The photo count on each row is what RTI would require before the item can be submitted. Work the list here and watch the gate hold, or load it into RTI and let it enforce the real thing.

01

Notice, lockout and bleed-down

  • Owner and air users told the outage window

    Owner and the shops on plant air told when air goes down, and pneumatic controls or valves that depend on it put on their backup supply or made safe first.

    No photo
  • Lock and tag applied before the annual teardown

    Every feed locked and tagged by each worker, tried dead. Air or power checks use the temporary release: guards on, people clear, receiver repressurized, run, then re-locked and bled.

  • Receiver isolated from the plant and bled to zero

    Discharge valve closed to the distribution, receiver bled through its drain until the gauge reads zero and left vented while the drain and crankcase are worked on.

02

Oil service

  • Oil changed and crankcase checked

    Old oil drained warm and volume noted, refilled to the sight-glass mark with the manufacturer's grade, no metal or sludge in the drained oil.

    No photo
  • Oil sample drawn for analysis on lubricated units

    Where the site runs oil analysis, a sample drawn warm before the drain, labeled with the unit and run hours, results compared with last year's. Oil-free units noted as such.

    No photo
03

Safeties and controls

  • Safety relief valve manually lifted and reseated

    Valve pulled by its ring against tank pressure, blows freely and reseats without weeping, and is replaced rather than left in service if it drips or won't lift.

  • Pressure switch cut-in/cut-out and unloader verified

    Cut-in and cut-out read at the gauge against the switch setting, unloader bleeds head pressure at shutdown so the motor restarts unloaded.

  • Receiver gauge compared against a calibrated test gauge

    Both gauges read at the same pressure, the unit gauge replaced if it is off by more than the manufacturer allows, so the switch setting is judged on a true reading.

04

Receiver and downstream

  • Receiver tank and automatic drain serviced

    Tank exterior checked for rust, pitting or bulging at the bottom seam and welds, automatic drain disassembled and cleared, drain valve reseated.

  • Aftercooler or air dryer serviced where fitted

    Aftercooler fins cleaned and the coalescing or dryer element checked, dryer holding dewpoint and draining, no water carrying downstream to the shop drops.

    No photo
  • Receiver nameplate rating matched to relief and cutout

    Nameplate legible, relief valve set pressure and switch cutout both no higher than the receiver's rated working pressure, mismatches reported to the owner.

  • Receiver inspection certificate current where required

    Where the jurisdiction or insurer requires a pressure vessel inspection, the inspector's certificate posted at the receiver is in date. Expired or missing ones reported to the owner.

    No photo
05

Return to service and records

  • Guards on, valves reset and locks removed by their owner

    Belt guard fastened, drain closed and discharge valve reopened to the plant, tools cleared, lock and tag removed by the person who hung them.

  • Motor current read loaded at cut-out against the nameplate

    Amps read as the unit nears cut-out under the site's energized-work procedure and its PPE, within the nameplate rating and compared with last year's reading.

  • Pump-up time timed on restart and the annual baseline filed

    Fill timed with plant demand steady, a slow fill pointing to worn valves or rings; fill time, amps, gauge check, relief result and oil analysis filed as next year's baseline.

    No photo

What usually sends this back

The failures are almost always the evidence, not the work

  • Relief valve never lifted because 'it's fine, it's not leaking', but it's seized and would not open on an overpressure.
  • Oil changed on schedule but the wrong grade kept on the shelf, so a straight detergent oil goes into a pump that calls for compressor oil.

Common questions

6 answers

What does this air compressor annual checklist cover?
15 items across 5 sections, covering notice, lockout and bleed-down, oil service, safeties and controls, receiver and downstream, and more. Each item spells out what the person walking the job is actually looking for, not just a box to tick.
Who should run this inspection?
The compressor service tech on the annual service.
When in the schedule should this walk happen?
Once a year. The oil change and the relief-valve lift are the two things the quarterly glance never actually does.
Why do these items ask for a photo?
9 of the 15 items call for photo evidence, 11 photos in all. A checklist answer without the photo is a claim; the photo is what makes the record worth something in a dispute and lets a reviewer approve work without re-walking the job.
What most often fails an air compressor annual inspection?
Relief valve never lifted because 'it's fine, it's not leaking', but it's seized and would not open on an overpressure. Oil changed on schedule but the wrong grade kept on the shelf, so a straight detergent oil goes into a pump that calls for compressor oil.
Can I use this checklist in RTI?
Yes. Start a free RTI workspace, build this list as a checklist, and the Photo Gate holds the submit button until every mandatory item is answered and its photos are attached. Approved inspections roll into a branded turnover package with a tamper evident audit trail.

Run it with the Photo Gate

A checklist nobody can submit half-finished

Load this list into RTI, stick a QR tag on the area it covers, and the submit button stays locked until every mandatory item is answered and the 11 required photos exist. Approved walks roll into a branded turnover package with a tamper evident record behind every line.

See all 508 checklists · 6741 items and 5984 photo requirements in total.