Skip to content
RTI

Free checklist

Water feature pump quarterly maintenance checklist

A quarterly water feature pump round is short on purpose: it catches the wear items that fail between annual services. This checklist is sized for a tech with a phone. Every item says what to look at and the photo that proves the round happened. Work is commonly verified against the applicable plumbing code, manufacturer's published instructions. Confirm the edition your authority having jurisdiction has adopted.

The checklist

Every item, and the photo evidence it needs

The photo count on each row is what RTI would require before the item can be submitted. Work the list here and watch the gate hold, or load it into RTI and let it enforce the real thing.

01

Site control and isolation

  • Public kept back from the basin before work starts

    Barrier or signs set around the basin and the owner's contact told the feature is going down, so no visitor reaches the water while it is open.

  • Every basin circuit locked out before hands go in the water

    Pump, lights, fill valve and feeders locked and tagged. Run checks use the temporary release: lids closed, all clear, locks off by their owners, re-locked before hands go back in.

  • Suction outlet covers fastened and uncracked

    Every suction outlet and intake cover on the pump or basin sump present, screwed down at each point, not cracked, warped or turned brittle by sun.

02

Pump and intake

  • Strainer and intake screen clear

    Intake screen and pump strainer basket cleared of leaves, silt and debris, not restricting flow, no cavitation noise.

  • Pump primed and running quiet

    Pump primed and moving water, no air lock, no grinding or dry-run whine, no leaks at the seal or unions.

03

Filtration and water treatment

  • Filter gauge compared with its clean baseline where fitted

    Where a filter and gauge are fitted, pressure read with the pump running against the clean reading on the tag, cleaned or backwashed at the manufacturer's change point.

    No photo
  • Water chemistry read against the operator's targets

    Sample dipped from the basin edge, sanitizer, pH and clarity read with the site's kit against the operator's targets, results logged, no algae or foam building.

04

Water level and fill

  • Basin level correct and auto-fill working

    Water above the pump intake and the low-water cutoff, auto-fill or float valve holding level, no continuous overflow to drain.

  • Makeup water use compared with the last round

    Fill meter reading or fill cycling compared with the last round, a jump beyond normal evaporation and splash flagged to the owner as a possible leak.

    No photo
05

Display and electrical protection

  • Flow and display at intended height with no dead nozzles

    Jets, weirs or spillways running evenly at design height, no plugged nozzles, flow valve set where it belongs.

  • GFCI protection and in-use covers intact

    GFCI trips and resets at the receptacle, in-use weatherproof covers in place, cords and connections dry and undamaged.

  • Wind control drops the display in a gust where fitted

    Wind sensor tripped with the controller's test or by spinning its cups, jets fall to the low setting or stop, then recover after the set delay.

    No photo
  • Underwater lights and lenses checked where fitted

    Lights on at the controller, lenses clear and uncracked, no water or fogging inside a fixture, cords held in their clips and not chafing on the basin edge.

    No photo
  • Cord entries and junction box lids closed and sealed

    Deck and junction box lids viewed closed and gasketed, cord grips tight, jackets uncracked where they leave the water, no box sitting in standing water.

  • Feature back on its schedule and the area reopened

    Timer and fill back in automatic, each lock and tag cleared by whoever hung it, barrier lifted, and the owner's contact told of any defect found.

What usually sends this back

The failures are almost always the evidence, not the work

  • Pump strainer or intake screen clogged with leaves and debris, so flow drops and the display collapses to a trickle.
  • Auto-fill valve stuck or the basin low, running the pump toward dry and burning up the seal.
  • GFCI or in-use cover missing, damaged or won't reset, leaving the pump on unprotected power at a wet location.

Common questions

6 answers

What does this water feature pump quarterly checklist cover?
15 items across 5 sections, covering site control and isolation, pump and intake, filtration and water treatment, water level and fill, and more. Each item spells out what the person walking the job is actually looking for, not just a box to tick.
Who should run this inspection?
The maintenance or landscape tech on the quarterly round.
When in the schedule should this walk happen?
Every quarter, because a decorative feature loses water to evaporation and splash and a pump that runs dry for a weekend is a pump you replace.
Why do these items ask for a photo?
11 of the 15 items call for photo evidence, 13 photos in all. A checklist answer without the photo is a claim; the photo is what makes the record worth something in a dispute and lets a reviewer approve work without re-walking the job.
What most often fails a water feature pump quarterly inspection?
Pump strainer or intake screen clogged with leaves and debris, so flow drops and the display collapses to a trickle. Auto-fill valve stuck or the basin low, running the pump toward dry and burning up the seal. GFCI or in-use cover missing, damaged or won't reset, leaving the pump on unprotected power at a wet location.
Can I use this checklist in RTI?
Yes. Start a free RTI workspace, build this list as a checklist, and the Photo Gate holds the submit button until every mandatory item is answered and its photos are attached. Approved inspections roll into a branded turnover package with a tamper evident audit trail.

Run it with the Photo Gate

A checklist nobody can submit half-finished

Load this list into RTI, stick a QR tag on the area it covers, and the submit button stays locked until every mandatory item is answered and the 13 required photos exist. Approved walks roll into a branded turnover package with a tamper evident record behind every line.

See all 508 checklists · 6741 items and 5984 photo requirements in total.