Raised access flooring punch checklist

Raised access flooring punch is where small misses become callbacks after the crew has demobilized. This checklist walks the finished work the way the owner and the next trade will see it, with the photo that closes each item instead of a note that reopens it. Work is commonly verified against manufacturer's published instructions. Confirm the edition your authority having jurisdiction has adopted.

Items
3
Photos required
5

Who runs it

The access floor foreman on a callback, or the GC's superintendent closing floor punch items before turnover.

When in the schedule

During closeout, after other trades have lifted and re-dropped panels for their work, which is when rocking and edge damage appear.

The checklist

Every item, and the photo that proves it

The photo count on each row is what RTI would require before the item can be submitted. Copy the list as is, or load it into RTI and let the gate enforce it.

01

Defect repair

  • Each rocking panel or damaged edge located

    A close shot of the condition plus a wide shot locating the panel on the grid, cause noted before adjustment.

    2 photos
  • Level and cut-panel touch-up completed

    Pedestal head re-leveled under the panel rather than shimmed, cut edges re-sealed and gaps closed, panel sitting flat afterward.

    2 photos
02

Signoff

  • No remaining floor items before the room is released

    All punch items per room closed with photos, floor walked once more with no rock or rattle before turnover.

    1 photo

What usually sends this back

The failures are almost always the evidence, not the work

  • A rocking panel shimmed at one corner instead of the pedestal head being re-leveled, so it settles back to rocking under load.
  • A cut-panel gap at a penetration caulked over cosmetically while the panel still isn't supported on all sides.

Run it with the Photo Gate

A checklist nobody can submit half-finished

Load this list into RTI, stick a QR tag on the area it covers, and the submit button stays locked until every mandatory item is answered and the 5 required photos exist. Approved walks roll into a branded turnover package with a tamper-evident record behind every line.

Submission state

Mandatory items answered3 of 3
Photos attached2 of 5
Submit locked, 3 photos missing

The gate is enforced on the server, so it holds even if the phone is offline when the walk happens.

Common questions

What does this raised access flooring punch checklist cover?
3 items across 2 sections, covering defect repair, signoff. Each item spells out what the person walking the job is actually looking for, not just a box to tick.
Who should run this inspection?
The access floor foreman on a callback, or the GC's superintendent closing floor punch items before turnover.
When in the schedule should this walk happen?
During closeout, after other trades have lifted and re-dropped panels for their work, which is when rocking and edge damage appear.
Why does every item ask for a photo?
5 of the 3 items call for photo evidence. A checklist answer without the photo is a claim; the photo is what makes the record worth something in a dispute and lets a reviewer approve work without re-walking the job.
What most often fails a raised access flooring punch inspection?
A rocking panel shimmed at one corner instead of the pedestal head being re-leveled, so it settles back to rocking under load. A cut-panel gap at a penetration caulked over cosmetically while the panel still isn't supported on all sides.
Can I use this checklist in RTI?
Yes. Start a free RTI workspace, build this list as a checklist, and the Photo Gate holds the submit button until every mandatory item is answered and its photos are attached. Approved inspections roll into a branded turnover package with a tamper-evident audit trail.