Resinous flooringResinous flooring final inspection checklist
Resinous flooring final inspection is where the punch list is either short or expensive. This checklist walks the finished work the way an owner or AHJ will see it: devices on, systems running, everything labeled. Each item gets the photo that closes it instead of reopening it. Work is commonly verified against manufacturer's published instructions. Confirm the edition your authority having jurisdiction has adopted.
- Items
- 5
- Photos required
- 8
- Built for
- Subcontractors
Who runs it
The flooring applicator with the GC's superintendent, walking the finished floor before turnover.
When in the schedule
After the full system is applied and cured, before equipment and traffic return to the area and before the owner's walk.
The checklist
Every item, and the photo that proves it
The photo count on each row is what RTI would require before the item can be submitted. Copy the list as is, or load it into RTI and let the gate enforce it.
Coverage and thickness
- 2 photos
Thickness verified by material consumption over area
Material used checked against the coated area and the specified build, thin or missed spots on the finish caught and recoated.
- 2 photos
Surface free of blisters, pinholes and fisheyes
Finished floor viewed across the light for outgassing pinholes, blisters and fisheyes, none left in the cured surface.
Cove base and edges
- 2 photos
Integral cove base continuous and terminated cleanly
Cove run to the specified height with a solid radius at the floor and a clean cap at the top, bonded with no voids behind it.
Cure and finish
- 1 photo
System cured to working hardness before use
Cure checked against the system schedule for the ambient conditions before foot or wheel traffic returns, no soft or tacky areas.
- 1 photo
Slip-resistant finish present where specified
Broadcast or textured finish uniform in the areas that call for it, grip consistent underfoot with no slick patches.
What usually sends this back
The failures are almost always the evidence, not the work
- Thickness assumed from the datasheet while the actual material consumed over the area comes up short of the specified build.
- Integral cove base run thin or with a rounded top edge that peels away from the wall at the termination.
- Slip-resistant broadcast skipped or under-applied in a wet area so the finished floor is slick where it needs grip.
Run it with the Photo Gate
A checklist nobody can submit half-finished
Load this list into RTI, stick a QR tag on the area it covers, and the submit button stays locked until every mandatory item is answered and the 8 required photos exist. Approved walks roll into a branded turnover package with a tamper-evident record behind every line.
Submission state
The gate is enforced on the server, so it holds even if the phone is offline when the walk happens.
Common questions
- What does this resinous flooring final checklist cover?
- 5 items across 3 sections, covering coverage and thickness, cove base and edges, cure and finish. Each item spells out what the person walking the job is actually looking for, not just a box to tick.
- Who should run this inspection?
- The flooring applicator with the GC's superintendent, walking the finished floor before turnover.
- When in the schedule should this walk happen?
- After the full system is applied and cured, before equipment and traffic return to the area and before the owner's walk.
- Why does every item ask for a photo?
- 8 of the 5 items call for photo evidence. A checklist answer without the photo is a claim; the photo is what makes the record worth something in a dispute and lets a reviewer approve work without re-walking the job.
- What most often fails a resinous flooring final inspection?
- Thickness assumed from the datasheet while the actual material consumed over the area comes up short of the specified build. Integral cove base run thin or with a rounded top edge that peels away from the wall at the termination. Slip-resistant broadcast skipped or under-applied in a wet area so the finished floor is slick where it needs grip.
- Can I use this checklist in RTI?
- Yes. Start a free RTI workspace, build this list as a checklist, and the Photo Gate holds the submit button until every mandatory item is answered and its photos are attached. Approved inspections roll into a branded turnover package with a tamper-evident audit trail.