Resinous flooringResinous flooring punch checklist
Resinous flooring punch is where small misses become callbacks after the crew has demobilized. This checklist walks the finished work the way the owner and the next trade will see it, with the photo that closes each item instead of a note that reopens it. Work is commonly verified against manufacturer's published instructions. Confirm the edition your authority having jurisdiction has adopted.
- Items
- 3
- Photos required
- 5
- Built for
- Subcontractors
Who runs it
The flooring applicator on a callback, or the GC's superintendent closing floor punch items.
When in the schedule
During closeout, after traffic and cleaning reveal weak bond and pinholes the initial walk missed.
The checklist
Every item, and the photo that proves it
The photo count on each row is what RTI would require before the item can be submitted. Copy the list as is, or load it into RTI and let the gate enforce it.
Repair
- 2 photos
Each defect located and photographed in context
A close shot of the delamination, pinhole cluster or damaged area plus a wide shot locating it in the room.
- 2 photos
Areas cut back, patched and topcoated to blend
Failed film cut back to sound material, patch built to the surrounding thickness and topcoated so the repair blends in color and texture.
Signoff
- 1 photo
No remaining flooring items before the area is released
All punch items in each room closed with photos and the repairs cured before the floor is turned over.
What usually sends this back
The failures are almost always the evidence, not the work
- A delaminated patch topcoated over without cutting back to sound, bonded film, so it lifts again at the same edge.
- Pinholes cosmetically filled on the surface while the outgassing that caused them is never addressed, so they reappear.
Run it with the Photo Gate
A checklist nobody can submit half-finished
Load this list into RTI, stick a QR tag on the area it covers, and the submit button stays locked until every mandatory item is answered and the 5 required photos exist. Approved walks roll into a branded turnover package with a tamper-evident record behind every line.
Submission state
The gate is enforced on the server, so it holds even if the phone is offline when the walk happens.
Common questions
- What does this resinous flooring punch checklist cover?
- 3 items across 2 sections, covering repair, signoff. Each item spells out what the person walking the job is actually looking for, not just a box to tick.
- Who should run this inspection?
- The flooring applicator on a callback, or the GC's superintendent closing floor punch items.
- When in the schedule should this walk happen?
- During closeout, after traffic and cleaning reveal weak bond and pinholes the initial walk missed.
- Why does every item ask for a photo?
- 5 of the 3 items call for photo evidence. A checklist answer without the photo is a claim; the photo is what makes the record worth something in a dispute and lets a reviewer approve work without re-walking the job.
- What most often fails a resinous flooring punch inspection?
- A delaminated patch topcoated over without cutting back to sound, bonded film, so it lifts again at the same edge. Pinholes cosmetically filled on the surface while the outgassing that caused them is never addressed, so they reappear.
- Can I use this checklist in RTI?
- Yes. Start a free RTI workspace, build this list as a checklist, and the Photo Gate holds the submit button until every mandatory item is answered and its photos are attached. Approved inspections roll into a branded turnover package with a tamper-evident audit trail.
Related checklists
2642 items and 4211 photo requirements in total.